Reporting requirements.

CFR · 2024-01-01 · US · Title 10

For the purpose of this section, a report or a part of a report may be made jointly by two or more entities. Every electric utility or other entity engaged in the generation, transmission or distribution of electric energy for delivery and/or sale to the public shall report promptly, through the DOE Emergency Operations Center, by telephone, the occurrence of any event such as described in paragraphs (a) through (d) of this section. These reporting procedures are mandatory. Entities that fail to comply within 24 hours will be contacted and reminded of their reporting obligation. (a) (1) Any load shedding actions resulting in the reduction of over 100 megawatts (MW) of (2) Equipment failures/system operational actions attributable to the loss of (i) Reports from entities with a previous year recorded peak load of over 3000 MW are required for all such losses of (ii) Reports from all other entities are required for all such losses of (3) Other events or occurrences which result in a continuous interruption for 3 hours or longer to over 50,000 customers, or more than 50 percent of the total customers being served immediately prior to the interruption, whichever is less. (b) (1) Reports are required for any anticipated or actual system voltage reductions of 3 percent or greater for purposes of maintaining the (2) Reports are required for any issuance of a public appeal to reduce the use of electricity for purposes of maintaining the (c) (1) Reports are required for any actual or

official document · source cfr-2024 · id 10:§ 205.351