Eligibility requirements.
CFR · 2024-01-01 · US · Title 10
(a) (2) Each pre-auction eligibility submission's implementation plan must, at a minimum: (i) Demonstrate that the filing party owns and operates or plans to own and operate an eligible cellulosic biofuels production facility; (ii) Identify the site or proposed site for the filing party's eligible cellulosic biofuels production facility; (iii) Demonstrate that the cellulosic biofuel to be produced for purposes of receiving an award either currently is suitable for widespread general use as a transportation fuel or will be suitable for such use in a timeframe and in sufficient volumes to significantly contribute to the goal of 1 billion gallons of refined cellulosic biofuel by August 2015. (iv) Provide audited or (v) Identify one or more proposed sources of financing for the construction or expansion of the filing party's eligible cellulosic biofuels production facility. (b) (c) (1) Acquired the site where its proposed eligible cellulosic biofuels production facility is or will be located; (2) Obtained secure financing commitments for the plant or expansion thereof, as necessary to produce cellulosic biofuels; and (3) Entered into a written engineering, procurement, and construction (EPC) contract for design and construction of the eligible cellulosic biofuels production facility; such EPC contract must provide for completion of construction of the eligible cellulosic biofuels production facility such that operations at the plant or plant expansion will commence within three y
official document · source cfr-2024 · id 10:§ 452.4