Contents of applications; technical information.
CFR · 2024-01-01 · US · Title 10
(a) (1) Stationary power reactor applicants for a construction permit who apply on or after January 10, 1997, shall comply with paragraph (a)(1)(ii) of this section. All other applicants for a construction permit shall comply with paragraph (a)(1)(i) of this section. (i) A description and safety assessment of the site on which the facility is to be located, with appropriate attention to features affecting facility design. Special attention should be directed to the site evaluation factors identified in part 100 of this chapter. The assessment must contain an analysis and evaluation of the major structures, systems and components of the facility which bear significantly on the acceptability of the site under the site evaluation factors identified in part 100 of this chapter, assuming that the facility will be operated at the ultimate power level which is contemplated by the applicant. With respect to operation at the projected initial power level, the applicant is required to submit information prescribed in paragraphs (a)(2) through (a)(8) of this section, as well as the information required by this paragraph, in support of the application for a construction permit, or a design approval. (ii) A description and safety assessment of the site and a safety assessment of the facility. It is expected that (A) Intended use of the reactor including the proposed maximum power level and the nature and inventory of contained radioactive materials; (B) The extent to which generally accep
official document · source cfr-2024 · id 10:§ 50.34