Cost calculations for new powerplants and installations.
CFR · 2024-01-01 · US · Title 10
(a) (2) The cost of using an alternate fuel as a primary energy source will be deemed to substantially exceed the cost of using imported petroleum if the difference between the cost of using alternate fuel and the cost of using imported oil is greater than zero. (3) There are two comparative cost calculations—a general cost test and a special cost test. Both take into consideration cash outlays for capital investments, annual expenses, and the effect of depreciation and taxes on cash flow. To demonstrate eligibility for a permanent exemption, a petitioner must use the procedures specified in the general cost test (paragraph (b) of this section). To demonstrate eligibility for a temporary exemption, the petitioner may apply the procedures specified in either the general cost test or the special cost test (paragraph (c) of this section). (b) (2) The petitioner would only be eligible for a temporary exemption if the computed costs of delayed alternate fuel use, commencing at the start of the second through eleventh years of operation, do not always substantially exceed the cost of using only imported petroleum. The length of the temporary exemption would be the minimum period from the start of operation in which the cost of using alternate fuel substantially exceeds the cost of using imported petroleum. (3) To conduct the general cost test, calculate the difference (DELTA) between the cost of using an alternate fuel (COST(ALTERNATE)) and the cost of using imported petroleum (COS
official document · source cfr-2024 · id 10:§ 503.6