legal · go-v.org

Simulation facilities.

CFR · 2024-01-01 · US · Title 10

(a) (b) (i) A description of the components of the simulation facility intended to be used, or the way the plant would be used for each part of the operating test, unless previously approved; and (ii) A description of the performance tests for the simulation facility as part of the request, and the results of these tests; and (iii) A description of the procedures for maintaining examination and test integrity consistent with the requirements of § 55.49. (2) The Commission will approve a simulation facility or use of the plant for administration of operating tests if it finds that the simulation facility and its proposed use, or the proposed use of the plant, are suitable for the conduct of operating tests for the facility licensee's reference plant under § 55.45(a). (c) (i) Is sufficient in scope and fidelity to allow conduct of the evolutions listed in §§ 55.45(a)(1) through (13), and 55.59(c)(3)(i)(A) through (AA), as applicable to the design of the reference plant. (ii) Allows for the completion of control manipulations for operator license applicants. (2) Facility licensees that propose to use a plant-referenced simulator to meet the control manipulation requirements in § 55.31(a)(5) must ensure that: (i) The plant-referenced simulator utilizes models relating to nuclear and thermal-hydraulic characteristics that replicate the most recent core load in the nuclear power reference plant for which a license is being sought; and (ii) Simulator fidelity has been demonstrated s

official document · source cfr-2024 · id 10:§ 55.46