legal · go-v.org

Conditions of approval.

CFR · 2024-01-01 · US · Title 10

(a) The certificate holder and applicant for a CoC shall ensure that the design, fabrication, testing, and maintenance of a spent fuel storage cask comply with the requirements in § 72.236. (b) The certificate holder and applicant for a CoC shall ensure that the design, fabrication, testing, and maintenance of spent fuel storage casks are conducted under a quality assurance program that meets the requirements of subpart G of this part. (c) An applicant for a CoC may begin fabrication of spent fuel storage casks before the Commission issues a CoC for the cask; however, applicants who begin fabrication of casks without a CoC do so at their own risk. A cask fabricated before the CoC is issued shall be made to conform to the issued CoC before being placed in service or before spent fuel is loaded. (d)(1) The certificate holder shall ensure that a record is established and maintained for each spent fuel storage cask fabricated under the CoC. (2) This record must include: (i) The NRC CoC number; (ii) The spent fuel storage cask model number; (iii) The spent fuel storage cask identification number; (iv) Date fabrication was started; (v) Date fabrication was completed; (vi) Certification that the spent fuel storage cask was designed, fabricated, tested, and repaired in accordance with a quality assurance program accepted by NRC; (vii) Certification that inspections required by § 72.236(j) were performed and found satisfactory; and (viii) The name and address of the licensee using the

official document · source cfr-2024 · id 10:§ 72.234