Installation requirements.
CFR · 2024-01-01 · US · Title 14
(a) The facility must be installed according to accepted good engineering practices, applicable electric and safety codes, and FCC requirements. (b) The SDF facility must have the following basic components: (1) VHF SDF equipment and associated monitor system; (2) Remote control, and indicator equipment (remote monitor) when required by the FAA; (3) A final approach fix; and (4) Compass locator (COMLO) or marker if suitable fixes and initial approach routes are not available from existing facilities. (c) The facility must have a reliable source of suitable primary power, either from a power distribution system or locally generated. Also, adequate power capacity must be provided for operation of test and working equipment at the SDF. A determination by the Federal Aviation Administration as to whether a facility will be required to have standby power for the SDF and monitor accessories to supplement the primary power will be made for each airport based upon operational minimums and density of air traffic. (d) A determination by the Federal Aviation Administration as to whether a facility will be required to have dual transmitting equipment with automatic changeover for the SDF will be made for each airport based upon operational minimums and density of air traffic. (e) There must be a means for determining, from the ground, the performance of the equipment (including antennae), initially and periodically. (f) The facility must have the following ground-air or landline communic
official document · source cfr-2024 · id 14:§ 171.113