Main float design.
CFR · 2024-01-01 · US · Title 14
(a) (1) The maximum pressure differential that might be developed at the maximum altitude for which certification with that float is requested; and (2) The vertical loads prescribed in § 27.521(a), distributed along the length of the bag over three-quarters of its projected area. (b)
official document · source cfr-2024 · id 14:§ 27.753