Takeoff cooling test procedures.
CFR · 2024-01-01 · US · Title 14
(a) (1) Each temperature must be stabilized while hovering in ground effect with— (i) The power necessary for hovering; (ii) The appropriate cowl flap and shutter settings; and (iii) The maximum weight. (2) After the temperatures have stabilized, a climb must be started at the lowest practicable altitude and must be conducted with one engine inoperative. (3) The operating engines must be at the greatest power for which approval is sought (or at full throttle when above the critical altitude) for the same period as this power is used in determining the takeoff climbout path under § 29.59. (4) At the end of the time interval prescribed in paragraph (b)(3) of this section, the power must be changed to that used in meeting § 29.67(a)(2) and the climb must be continued for— (i) Thirty minutes, if 30-minute OEI power is used; or (ii) At least 5 minutes after the occurrence of the highest temperature recorded, if continuous OEI power or maximum continuous power is used. (5) The speeds must be those used in determining the takeoff flight path under § 29.59. (b) (1) Each temperature must be stabilized while hovering in ground effect with— (i) The power necessary for hovering; (ii) The appropriate cowl flap and shutter settings; and (iii) The maximum weight. (2) After the temperatures have stabilized, a climb must be started at the lowest practicable altitude with takeoff power. (3) Takeoff power must be used for the same time interval as takeoff power is used in determining the takeof
official document · source cfr-2024 · id 14:§ 29.1047