legal · go-v.org

General information.

CFR · 2024-01-01 · US · Title 14

(a) (1) The responsibilities of a launch operator conducting a licensed launch of an expendable launch vehicle pursuant to a license issued under part 415 of this chapter; and (2) The requirements for maintaining a launch license obtained under part 415 of this chapter. Parts 413 and 415 of this chapter contain requirements for preparing a license application to conduct a launch, including information reviewed by the FAA to conduct a policy, safety, payload, and environmental review, and a payload determination (b) (2) The safety requirements of subparts B through E of this part apply to all licensed launches of expendable launch vehicles. See paragraph (d) of this section for exceptions to this provision. (c) (1) Range flight plan approval, (2) Missile system pre-launch safety package, (3) Preliminary and final flight data packages, (4) A tailored version of EWR 127-1, (5) Range email to the FAA stating that the MIC was approved, or (6) Operation approval. (d) (1) Range flight plan approval, (2) Missile system pre-launch safety package, (3) Preliminary and final flight data packages, (4) A tailored version of EWR 127-1, (5) Range email to the FAA stating that the waiver was approved, or (6) Operation approval. (e) (1) The launch operator modifies the launch vehicle's operation or safety characteristics; (2) The launch operator uses the launch vehicle, component, system, or subsystem in a new application; (3) The FAA or the launch operator determines that a previously unfores

official document · source cfr-2024 · id 14:§ 417.1