Launch plans.
CFR · 2024-01-01 · US · Title 14
(a) (b) (1) (i) Approve and implement each part of the flight safety plan and any modifications to the plan; and (ii) Perform the flight safety analysis and ensure that the results, including the flight safety rules and establishment of flight hazard areas, are incorporated into the flight safety plan. (2) (3) (4) (5) (6) (7) (8) (i) Launch angle limits, as required by § 417.125(c)(3); and (ii) All procedures for measurement of launch day winds and for performing wind weighting as required by §§ 417.125 and 417.233. (c) (1) A description of the launch vehicle and any payload, or class of payload, identifying each hazard, including explosives, propellants, toxics and other hazardous materials, radiation sources, and pressurized systems. A ground safety plan must include figures that show the location of each hazard on the launch vehicle, and indicate where at the launch site a launch operator performs hazardous operations during launch processing. (2) Propellant and explosive information including: (i) Total net explosive weight of each of the launch operator's liquid and solid propellants and other explosives for each explosive hazard facility as defined by part 420 of this chapter. (ii) For each toxic propellant, any hazard controls and process constraints determined under the launch operator's toxic release hazard analysis for launch processing performed as required by § 417.229 and appendix I of this part. (iii) The explosive and occupancy limits for each explosive hazard
official document · source cfr-2024 · id 14:§ 417.111