Launch safety rules.
CFR · 2024-01-01 · US · Title 14
(a) (1) The launch safety rules must identify the meteorological conditions and the status of the launch vehicle, launch support equipment, and personnel under which launch processing and flight may be conducted without adversely affecting public safety. (2) The launch safety rules must satisfy the requirements of this section. (3) A launch operator must follow all the launch safety rules. (b) (c) (1) The flight-commit criteria must implement the flight safety analysis of subpart C of this part and collision avoidance requirements in § 450.169 and critical asset protection requirements in § 450.101(a)(4) and (b)(4). These must include criteria for: (i) Surveillance of any region of land, sea, or air necessary to ensure the number and location of members of the public are consistent with the inputs used for the flight safety analysis of subpart C of this part; (ii) Monitoring of any meteorological condition and implementing any flight constraint developed using appendix G of this part. The launch operator must have clear and convincing evidence that the lightning flight commit criteria of appendix G, which apply to the conditions present at the time of lift-off, are not violated. If any other hazardous conditions exist, other than those identified by appendix G, the launch weather team will report the hazardous condition to the official designated under § 417.103(b)(1), who will determine whether initiating flight would expose the launch vehicle to a lightning hazard and not i
official document · source cfr-2024 · id 14:§ 417.113