Preparation of plans and specifications.
CFR · 2024-01-01 · US · Title 7
The provisions of this section apply to all borrower electric system facilities regardless of the source of financing. (a) (2) Plans and specifications for distribution, transmission, or generating facilities must be based on a construction work plan (as amended, if applicable), engineering study or construction program which has been approved by RUS if financing for the facilities will at any time be requested from RUS. (b) (i) (ii) (iii) (iv) (A) A plot plan showing the location of the proposed building plus paving and site development; (B) A one line drawing (floor plan and elevation view), to scale, of the proposed building with overall dimensions shown; and (C) An outline specification including materials to be used (type of frame, exterior finish, foundation, insulation, etc.); and (v) (2) For contract work, the appropriate standard RUS construction contract form shall be used as required by part 1726 of this chapter.