Plans and specifications (P&S).
CFR · 2024-01-01 · US · Title 7
(a) (2) The P&S shall specify the delivery and completion time required for each exchange. (3) P&S for equipment to be provided under an Equipment Contract, RUS Contract Form 395 (RUS Contract Form 395) contract without installation shall require the supplier to provide specific installation information and a detailed bonding and grounding plan to be utilized by the engineer, borrower, and others responsible for the installation of the equipment. (b) (c) RUS review of P&S is required for construction estimated to cost over $500,000 total or estimated to cost more than 25% of the total loan, whichever is less. (1) If RUS review is required, the borrower shall submit one copy of the P&S to the GFR for RUS review. (2) RUS will review the P&S and notify the borrower in writing of approval or disapproval.