Procedures.
CFR · 2024-01-01 · US · Title 7
(a) (i) The scope of the construction to be undertaken, stating briefly the facilities and equipment to be installed and other pertinent data. (ii) The name and qualifications of the construction supervisor who will be directly in charge of construction, the names and qualifications of the construction foremen, and the availability of qualified construction personnel. The construction supervisor must have at least 5 years outside plant construction experience with at least 2 years at the supervisory level on RUS financed projects. Construction foremen must have at least 3 years of outside plant construction experience. (iii) The availability of equipment for construction, exclusive of equipment needed for normal operation and maintenance. (2) [Reserved] (b) (1) The RUS Contract Form 515 and appropriate supporting attachments that normally would be provided as plans and specifications for contract construction. See § 1753.47. (2) The cost estimate, using Form 515 as a convenient means of showing the following: (i) The quantity and cost estimates of the various assembly units required. “Labor and other” cost will not include the cost of engineering, legal, and other professional services, interest during construction, preliminary survey and investigation charges, and right-of-way easement procurement costs. (ii) A list identifying materials or construction for which loan funds will not be requested. (3) The estimated completion time. (c) (d) (2) (3) (ii) Maintain records on all
official document · source cfr-2024 · id 7:§ 1753.57