Supplemental requirements for more complex construction.
CFR · 2024-01-01 · US · Title 7
This section includes additional provisions that apply to planning and conduct of construction work on all multiple family housing projects and other projects that are more extensive in scope and more complex in nature than (a) (1) (2) (3) (4) (i) The services listed in paragraph (a)(5) of this section. (ii) The amount of the fee and how it will be determined and paid. (iii) That the agreement and any amendments to the agreement shall not be in full force and effect until concurred with in writing by the State Director or the State Director's delegate, and it will contain the following provision: (5) (i) (A) Consult with the applicant to obtain available information pertinent to the project requirements. (B) Consult with Agency State architect/engineer about Agency requirements and procedures. (C) Assist in preparing the project design after analyzing engineering and survey data on the site selected by applicant. (D) Prepare schematic design studies consisting of drawings and other documents illustrating the scale and relationship of project components for the applicant's approval. (E) Submit estimates of current development costs based on current area, volume, or other unit costs. (F) When the applicant and the Agency have accepted the schematic design studies and estimated development (ii) (A) Prepare the design development exhibits from the accepted schematic design studies for approval by the applicant. These exhibits should consist of drawings and other documents to fix
official document · source cfr-2024 · id 7:§ 1924.13