Planning, bidding, contracting, constructing, procuring.
CFR · 2024-01-01 · US · Title 7
(a) (b) (1) (2) (3) (c) (d) (1) (2) (3) (e) (f) (g) (h) (1) Small purchase procedures as provided in § 1942.18(k)(1) of subpart A of this part 1942. (2) Competitive sealed bids as provided in § 1942.18(k)(2) of subpart A of this part 1942. Competitive sealed bids is the preferred procurement method of construction projects, except for buildings costing $100,000 or less when the owner desires to use a “preengineered” or “packaged” building. (3) Competitive negotiation as provided in § 1942.18(k)(3) of subpart A of this part 1942. Competitive negotiation is the preferred procurement method of buildings not exceeding $100,000 in cost when the owner desires to use a “pre-engineered” or “packaged” building and for major equipment. (4) Noncompetitive negotiation as provided in § 1942.18(k)(4) of subpart A of this part 1942. (i) (j) (k) (l) (1) (2) (i) A comparison of actual accomplishments with the construction schedule established for the period. The partial payment estimate may be used for this purpose. (ii) A narrative statement giving full explanation of the following: (A) Reasons why established goals were not met. (B) Analysis and explanation of cost overruns or high unit costs and how payment is to be made for the same. (iii) If events occur between reports which have a significant impact upon the project, the owner will notify RD as soon as any of the following conditions are known: (A) Problems, delays, or adverse conditions which will materially affect the ability to atta
official document · source cfr-2024 · id 7:§ 1942.126