Feasibility studies.
CFR · 2024-01-01 · US · Title 7
A feasibility study by a recognized independent consultant will be required for all loans, except as provided in this paragraph. The cost of the study will be borne by the borrower and may be paid from funds included in the loan. The loan approval official may make an exception to the requirement of a feasibility study for loans to existing businesses when the financial history of the business, the current financial condition of the business, and guarantees or other collateral offered for the loan are sufficient to protect the interest of the lenders and Rural Development. Rural Development will thoroughly document the justification for the exception to the feasibility study for such businesses. An acceptable feasibility study should include but not be limited to: (a) (b) (c) (d) (e)
official document · source cfr-2024 · id 7:§ 1980.442