legal · go-v.org

Project eligibility requirements.

CFR · 2024-01-01 · US · Title 7

(a) The Project must be located in a State. (b) The Project must be for either: (1) The development, construction, and Retrofitting of Technologically New Commercial-Scale processing and manufacturing equipment and required facilities that will be used to convert Renewable Chemicals and other biobased outputs of Biorefineries into end-user products on a Commercial Scale; or (2) The development, construction, or Retrofitting of a Commercial-Scale Biorefinery using Eligible Technology. (c) The Borrower and other principals involved in the Project must make a significant equity investment in the Project in the form of cash contribution. Equity does not include loans to the Project. The Agency will evaluate the adequacy of equity in its credit evaluation in accordance with § 4279.215(b). (d) Eligible Project Costs are only those costs associated with the items listed in paragraphs (d)(1) through (9) of this section, as long as the items are assets owned by the Borrower or expenses incurred by the Borrower and the items are an integral and necessary part of the Project, as determined by the Agency. A Project may consist of multiple facilities or components located at multiple locations. (1) Purchase and installation of equipment (new, refurbished, or remanufactured), including an integrated demonstration unit if the integrated demonstration unit will be used by the Borrower in the Project after the Project is developed and in operation. (2) New construction or Retrofitting of exis

official document · source cfr-2024 · id 7:§ 4279.210