Definitions.
CFR · 2024-01-01 · US · Title 7
The definitions set forth in this section are applicable for all purposes of program administration under this subpart. (1) The extended operating period must be at least 24 months of recorded usage, and requires metered utility records for electric energy, natural gas consumption, fuel oil, coal shipments (2) Utility billing, oil and coal shipments must be actual bills, with meter readings, applicable rates and tariffs, costs and usage. Billing must be complete, without gaps and arranged in chronological order. Drop shipments of coal or oil can be substituted for metered readings, provided the biorefinery documents the usage and its relationship to providing heat or power to the biorefinery. (3) A biorefinery in existence on or before June 18, 2008 with less than 24 months of actual operating data must provide at least 12 months of data supported by engineering and design calculations, and site plans, prepared by the construction engineering firm. (1) Composed, in whole or in significant part, of biological products, including renewable domestic agricultural materials and forestry materials; or (2) Intermediate ingredients or feedstocks. (1) Materials, pre-commercial thinnings, or invasive species from National Forest System land or public lands (as defined in section 103 of the Federal Land Policy and Management Act of 1976 (43 U.S.C. 1702)) that: (i) Are byproducts of preventive treatments that are removed to reduce hazardous fuels; to reduce or contain disease or insect i
official document · source cfr-2024 · id 7:§ 4288.2