Program administration.
CFR · 2024-01-01 · US · Title 7
(a) (2) Sponsors must: (i) Contribute their share of the project costs, as determined by NRCS, by providing funds or certain services necessary to undertake the activity. Contributions that may be applied towards the sponsor's applicable cost-share of construction costs include: (A) Cash; (B) In-kind services such as labor, equipment, design, surveys, contract administration and construction inspection, and other services as determined by the State Conservationist; or (C) A combination of cash and in-kind services; (ii) Obtain any necessary real property rights, water rights, and regulatory permits; (iii) Agree to provide for any required operation and maintenance of the completed emergency measures; and (iv) Comply with applicable registration and reporting requirements of the Federal Funding Accountability and Transparency Act of 2006 (Pub. L. 109-282, as amended), and 2 CFR parts 25 and 170. (b) (1) Priority EWP assistance is available to alleviate exigency situations. NRCS may approve assistance for temporary correction practices to relieve an exigency situation until a more acceptable solution can be designed and implemented. (2) (ii) EWP assistance will not be used to perform operation or maintenance, such as the periodic work that is necessary to maintain the efficiency and effectiveness of a measure to perform as originally designed and installed. (iii) EWP assistance will not be used to repair, rebuild, or maintain private or public transportation facilities, public
official document · source cfr-2024 · id 7:§ 624.6