Land eligibility.
CFR · 2024-01-01 · US · Title 7
(a) For land to be eligible, it must be nonindustrial private forest land and must, as determined by FSA: (1) Have existing tree cover or have had tree cover immediately before the natural disaster and be suitable for growing trees; (2) Have damage to natural resources caused by a natural disaster that, if not treated, would impair or endanger the natural resources on the land and would materially affect future use of the land; and (3) Be physically located in a county in which EFRP has been implemented. (b) Land is ineligible for EFRP if FSA determines that the land is any of the following: (1) Owned or controlled by the United States; or (2) Owned or controlled by States, including State agencies or political subdivisions of a State.
official document · source cfr-2024 · id 7:§ 701.205