legal · go-v.org

Legal · US

225,069 document(s) from the ingested source(s); showing 100.

page 39 of 2251 · 225,069 documents · previous next

Actions at 2.0 to 2.5 percent methane in bleeder systems (I-A and III mines).

CFR · 2024-01-01 · US · Title 30

If methane reaches 2.0 percent in bleeder systems at the point where a bleeder split enters a main return split, mining shall not be permitted on ventilation splits affected by the bleeder system. If methane has not been reduced to less than 2.0 percent within 30 minutes, or if methane levels reach 2.5 percent, all persons other than competent persons necessary to take corrective action shall be withdrawn from affected areas.

official document · source cfr-2024

Actions available to EPA to obtain compliance.

CFR · 2024-01-01 · US · Title 40

(a) (b) (2) (ii) The answer and request for a hearing shall be sent by registered mail, return receipt requested, to the Chief Administrative Law Judge (ALJ) (A-110), United States Environmental Protection Agency, 1200 Pennsylvania Ave., NW., Washington, DC 20460. Upon receipt of a request for a hearing, the ALJ will send the applicant or recipient a copy of the ALJ's procedures. If the recipient does not request a hearing, it shall be deemed to have waived its right to a hearing, and the OCR finding shall be deemed to be the ALJ's determination. (3) (ii) If the Administrator reviews the ALJ's determination, all parties shall be given reasonable opportunity to file written statements. A copy of the Administrator's decision will be sent to the applicant or recipient. (iii) If the Administrator's decision is to deny an application, or annul, suspend or terminate EPA assistance, that decision becomes effective thirty (30) days from the date on which the Administrator submits a full written report of the circumstances and grounds for such action to the Committees of the House and Senate having legislative jurisdiction over the program or activity involved. The decision of the Administrator shall not be subject to further administrative appeal under EPA's General Regulation for Assistance Programs (40 CFR part 30, subpart L). (4)

official document · source cfr-2024

Actions because of noncompliance.

CFR · 2024-01-01 · US · Title 48

The contracting officer must take necessary action as soon as possible upon notification by the appropriate agency official to implement any sanctions imposed on a contractor by the Department of Labor for violations of the clause at 52.222-35, Equal Opportunity for Veterans. These sanctions (see 41 CFR 60-300.66) may include— (a) Withholding progress payments; (b) Termination or suspension of the contract; or (c) Debarment of the contractor.

official document · source cfr-2024

Actions because of noncompliance.

CFR · 2024-01-01 · US · Title 48

The contracting officer shall take necessary action, as soon as possible upon notification by the appropriate agency official, to implement any sanctions imposed on a contractor by the Department of Labor for violations of the clause at 52.222-36, Equal Opportunity for Workers with Disabilities. These sanctions (see 41 CFR 60-741.66) may include— (a) Withholding from payments otherwise due; (b) Termination or suspension of the contract; or (c) Debarment of the contractor.

official document · source cfr-2024

Actions being taken pursuant to Presidential Proclamation 10414 and Section 318(a) of the Act.

CFR · 2024-01-01 · US · Title 19

(a) (b) (i) The Secretary shall instruct CBP to discontinue the suspension of liquidation of entries and collection of cash deposits for any Southeast Asian-Completed Cells and Modules that were suspended pursuant to § 351.226(l) of this chapter. If at the time instructions are conveyed to CBP the entries at issue are suspended and cash deposits collected only on the basis of the circumvention inquiries, then the Secretary will direct CBP to liquidate the entries without regard to antidumping and countervailing duties and to refund cash deposits collected on that basis. (ii) In the event of an affirmative preliminary or final determination of circumvention in the Solar Circumvention Inquiries before the Date of Termination, the Secretary will not, at that time, direct CBP to suspend liquidation of Applicable Entries and collect cash deposits of estimated duties on those Applicable Entries. (iii) In the event of an affirmative preliminary or final determination of circumvention in the Solar Circumvention Inquiries, the Secretary will direct CBP to suspend liquidation of entries of, and collect cash deposits of estimated duties on, imports of Southeast Asian-Completed Cells and Modules that are not Applicable Entries. (2) In the event that the Secretary makes an affirmative preliminary or final determination of circumvention in the Solar Circumvention Inquiries, as applicable, and the emergency described in Presidential Proclamation 10414 is terminated before June 6, 2024, notw

official document · source cfr-2024

Actions by claimant.

CFR · 2024-01-01 · US · Title 46

(a) (b)

official document · source cfr-2024

Actions by claimant.

CFR · 2024-01-01 · US · Title 46

(a) (b)

official document · source cfr-2024

Actions by employer prohibited by law.

CFR · 2024-01-01 · US · Title 34

An employer may not discharge, refuse to employ, or take disciplinary action against a debtor due to the issuance of a garnishment order under this part.

official document · source cfr-2024

Actions by states and private persons.

CFR · 2024-01-01 · US · Title 16

(a) Any attorney general or other officer of a state authorized by the state to bring an action under the Telemarketing and Consumer Fraud and Abuse Prevention Act, and any private person who brings an action under that Act, shall serve written notice of its action on the Commission, if feasible, prior to its initiating an action under this Rule. The notice shall be sent to (b) Nothing contained in this Section shall prohibit any attorney general or other authorized state official from proceeding in state court on the basis of an alleged violation of any civil or criminal statute of such state.

official document · source cfr-2024

Actions by states.

CFR · 2024-01-01 · US · Title 12

Any attorney general or other officer of a state authorized by the state to bring an action under this part may do so pursuant to section 626(b) of the 2009 Omnibus Appropriations Act, Public Law 111-8, section 626, 123 Stat. 524 (Mar. 11, 2009), as amended by the Credit Card Accountability Responsibility and Disclosure Act of 2009, Public Law 111-24, section 511, 123 Stat. 1734 (May 22, 2009), and as amended by Public Law 111-203, section 1097, 124 Stat. 2102 (July 21, 2010).

official document · source cfr-2024

Actions by states.

CFR · 2024-01-01 · US · Title 12

Any attorney general or other officer of a state authorized by the state to bring an action under this part may do so pursuant to section 626(b) of the 2009

official document · source cfr-2024

Actions by the Administrator.

CFR · 2024-01-01 · US · Title 40

(a) The Administrator may, whenever he determines necessary, extend the period for submission of any plan or plan revision or portion thereof. (b) After receipt of a plan or plan revision, the Administrator will propose the plan or revision for approval or disapproval. The Administrator will, within four months after the date required for submission of a plan or plan revision, approve or disapprove such plan or revision or each portion thereof. (c) The Administrator will, after consideration of any State hearing record, promptly prepare and publish proposed regulations setting forth a plan, or portion thereof, for a State if: (1) The State fails to submit a plan within the time prescribed; (2) The State fails to submit a plan revision required by § 60.23(a)(2) within the time prescribed; or (3) The Administrator disapproves the State plan or plan revision or any portion thereof, as unsatisfactory because the requirements of this subpart have not been met. (d) The Administrator will, within six months after the date required for submission of a plan or plan revision, promulgate the regulations proposed under paragraph (c) of this section with such modifications as may be appropriate unless, prior to such promulgation, the State has adopted and submitted a plan or plan revision which (e)(1) Except as provided in paragraph (e)(2) of this section, regulations proposed and promulgated by the Administrator under this section will prescribe emission standards of the same stringency

official document · source cfr-2024

Actions by the Administrator.

CFR · 2024-01-01 · US · Title 40

(a) The Administrator may, whenever he determines necessary, amend the period for submission of any plan or plan revision or portion thereof. (b) After determination that a plan or plan revision is complete per the requirements of § 60.27a(g), the Administrator will take action on the plan or revision. The Administrator will, within twelve months of finding that a plan or plan revision is complete, approve or disapprove such plan or revision or each portion thereof. (1) (2) (c) The Administrator will promulgate, through notice-and-comment rulemaking, a Federal plan, or portion thereof, at any time within twelve months after: (1) The State fails to submit a plan or plan revision within the time prescribed or the State has failed to satisfy the minimum criteria under paragraph (g) of this section as of the time prescribed in paragraph (g)(1) of this section; or (2) The Administrator disapproves the required State plan or plan revision or any portion thereof, as unsatisfactory because the applicable requirements of this subpart or an applicable emission guideline under this part have not been met. (d) The Administrator will promulgate a final Federal plan, or portion thereof, as described in paragraph (c) of this section unless the State corrects the deficiency, and the Administrator approves the plan or plan revision, before the Administrator promulgates such Federal plan. (e)(1) Except as provided in paragraph (e)(2) of this section, a federal plan promulgated by the Administr

official document · source cfr-2024

Actions by the Commission on its own motion.

CFR · 2024-01-01 · US · Title 47

The Commission may on its own motion conduct such inquiries and hold such proceedings as it may deem necessary to enforce the requirements of this subpart. The procedures to be followed by the Commission shall, unless specifically prescribed in the Act and the Commission's rules, be such as in the opinion of the Commission will best serve the purposes of such inquiries and proceedings.

official document · source cfr-2024

Actions categorically excluded from further NEPA review.

CFR · 2024-01-01 · US · Title 43

Categorical Exclusion means a category or kind of action that has no significant individual or cumulative effect on the quality of the human environment. See 40 CFR 1508.4. (a) Except as provided in paragraph (c) of this section, if an action is covered by a Departmental categorical exclusion, the bureau is not required to prepare an environmental assessment (see subpart D of this part) or an environmental impact statement (see subpart E of this part). If a proposed action does not meet the criteria for any of the listed Departmental categorical exclusions or any of the individual bureau categorical exclusions, then the proposed action must be analyzed in an environmental assessment or environmental impact statement. (b) The actions listed in section 46.210 are categorically excluded, Department-wide, from preparation of environmental assessments or environmental impact statements. (c) The CEQ Regulations at 40 CFR 1508.4 require agency procedures to provide for extraordinary circumstances in which a normally excluded action may have a significant environmental effect and require additional analysis and action. Section 46.215 lists the extraordinary circumstances under which actions otherwise covered by a categorical exclusion require analyses under NEPA. (1) Any action that is normally categorically excluded must be evaluated to determine whether it meets any of the extraordinary circumstances in section 46.215; if it does, further analysis and environmental documents must b

official document · source cfr-2024

Actions concerning the location of the discharge.

CFR · 2024-01-01 · US · Title 40

The effects of the discharge can be minimized by the choice of the disposal site. Some of the ways to accomplish this are by: (a) Locating and confining the discharge to minimize smothering of ­organisms; (b) Designing the discharge to avoid a disruption of periodic water inundation patterns; (c) Selecting a disposal site that has been used previously for dredged ma­terial discharge; (d) Selecting a disposal site at which the substrate is composed of material similar to that being discharged, such as discharging sand on sand or mud ­on mud; (e) Selecting the disposal site, the discharge point, and the method of ­discharge to minimize the extent of ­any plume; (f) Designing the discharge of dredged or fill material to minimize or prevent the creation of standing bodies of water in areas of normally fluctuating water levels, and minimize or prevent the drainage of areas subject to such fluctuations.

official document · source cfr-2024

Actions concerning the material to be discharged.

CFR · 2024-01-01 · US · Title 40

The effects of a discharge can be minimized by treatment of, or limitations on the material itself, such as: (a) Disposal of dredged material in such a manner that physiochemical conditions are maintained and the potency and availability of pollutants are reduced. (b) Limiting the solid, liquid, and gaseous components of material to be discharged at a particular site; (c) Adding treatment substances to the discharge material; (d) Utilizing chemical flocculants to enhance the deposition of suspended particulates in diked disposal areas.

official document · source cfr-2024

Actions controlling the material after discharge.

CFR · 2024-01-01 · US · Title 40

The effects of the dredged or fill material after discharge may be controlled by: (a) Selecting discharge methods and disposal sites where the potential for erosion, slumping or leaching of materials into the surrounding aquatic ecosystem will be reduced. These sites or methods include, but are not limited to: (1) Using containment levees, sediment basins, and cover crops to reduce erosion; (2) Using lined containment areas to reduce leaching where leaching of chemical constituents from the discharged material is expected to be a problem; (b) Capping in-place contaminated material with clean material or selectively discharging the most contaminated material first to be capped with the remaining material; (c) Maintaining and containing discharged material properly to prevent point and nonpoint sources of pollution; (d) Timing the discharge to minimize impact, for instance during periods of unusual high water flows, wind, wave, and tidal actions.

official document · source cfr-2024

Actions during NEPA reviews.

CFR · 2024-01-01 · US · Title 7

(a) Except as specified in paragraphs (b) and (c) of this section, FSA or a program participant must not take any action, implement any component of a proposed action, or make any final decision during FSA's NEPA and environmental compliance review process that could have an adverse environmental (1) Determines that the proposed action is categorically excluded under NEPA under subpart D of this part and does not trigger any extraordinary circumstances; or (2) Issues a FONSI or ROD under subpart E or F of this part. (b) FSA may approve interim actions related to proposed actions provided the: (1) Interim actions will not have an adverse environmental impact; (2) Expenditure is necessary to maintain a schedule for the proposed action; (3) Interim actions and expenditures will not compromise FSA's environmental compliance review and decision making process for the larger action; (4) Interim actions and expenditures will not segment otherwise connected actions; and (5) NEPA and associated environmental compliance review has been completed for the interim action or expenditure. (c) FSA and program participants may develop preliminary plans or designs, or perform work necessary to support an application for Federal, State, or local permits or assistance, during the NEPA review process, provided all requirements in paragraphs (a) and (b) of this section are met.

official document · source cfr-2024

Actions during a suspension.

CFR · 2024-01-01 · US · Title 33

(a) If a Certificate of Adequacy is suspended for longer than a five day period, the person in charge shall return (b) After the suspension is in effect, the COTP may— (1) Terminate the suspension order after receiving information from the person in charge that corrective action has been taken; or (2) Revoke the Certificate of Adequacy if no significant action is undertaken by the person in charge to meet any measures ordered by the COTP.

official document · source cfr-2024

Actions filed by administrative law judges.

CFR · 2024-01-01 · US · Title 5

An administrative law judge who alleges a constructive removal or other action by an agency in violation of 5 U.S.C. 7521 may file a complaint with the Board under this subpart. The filing and service requirements of § 1201.137 of this part apply. Such complaints shall be adjudicated in the same manner as agency complaints under this subpart.

official document · source cfr-2024

Actions following investigation.

CFR · 2024-01-01 · US · Title 50

Upon receipt of a report and recommendations based upon an investigation conducted under § 90.15, the Secretary shall make a determination that the applicant meets the qualifications for receiving grain. He shall then determine the quantity of grain, either bagged or in bulk, to be made available; the means of transportation; and the point of delivery in the vicinity of the crop damage. Before receiving delivery of such grain the applicant shall (a) That grain made available to him under this part will be used exclusively for the prevention and abatement of crop damage by migratory waterfowl and that no portion of such grain will be sold, donated, exchanged, or used as feed for livestock or other domestic animals or for any other purpose; (b) That consent is granted to any officer authorized to enforce this part, to inspect, supervise or direct the placement and distribution of grain made available under this part for the prevention of crop damage at all reasonable times; (c) That free and unrestricted access over the premises on which feeding operations have been or are to be conducted shall be permitted at all reasonable times, by any officer authorized to enforce this part and that such information as may be required by the officer will be promptly furnished; and (d) That the applicant will not take, nor permit his agents, employees, invitees, or other persons under his control to take migratory game birds on or over any lands or waters subject to his control, during the t

official document · source cfr-2024

Actions for excessive methane.

CFR · 2024-01-01 · US · Title 30

(a) (b) (i) Except intrinsically safe atmospheric monitoring systems (AMS), electrically powered equipment in the affected area shall be deenergized, and other mechanized equipment shall be shut off; (ii) Changes or adjustments shall be made at once to the ventilation system to reduce the concentration of methane to less than 1.0 percent; and (iii) No other work shall be permitted in the affected area until the methane concentration is less than 1.0 percent. (2) When 1.5 percent or more methane is present in a working place or an intake air course, including an air course in which a belt conveyor is located, or in an area where mechanized mining equipment is being installed or removed— (i) Everyone except those persons referred to in § 104(c) of the Act shall be withdrawn from the affected area; and (ii) Except for intrinsically safe AMS, electrically powered equipment in the affected area shall be disconnected at the power source. (c) (2) When 1.5 percent or more methane is present in a return air split between the last working place on a working section and where that split of air meets another split of air, or the location where the split is used to ventilate seals or worked-out areas— (i) Everyone except those persons referred to in § 104(c) of the Act shall be withdrawn from the affected area; (ii) Other than intrinsically safe AMS, equipment in the affected area shall be deenergized, electric power shall be disconnected at the power source, and other mechanized equipmen

official document · source cfr-2024

Actions for reimbursement, public notice, and congressional reports.

CFR · 2024-01-01 · US · Title 8

(a) (ii) The request for reimbursement must specify the date the sponsor, household member, or joint sponsor's support obligation commenced (this is the date the sponsored immigrant became a permanent resident), the sponsored immigrant's name, alien registration number, address, and date of birth, as well as the types of means-tested public benefit(s) that the sponsored immigrant received, the dates the sponsored immigrant received the means-tested public benefit(s), and the total amount of the means-tested public benefit(s) received. (iii) It is not necessary to make a separate request for each type of means-tested public benefit, nor for each separate payment. The agency may instead aggregate in a single request all benefit payments the agency has made as of the date of the request. A state or local government may make a single reimbursement request on behalf of all of the state or local government agencies that have provided means-tested public benefits. (iv) So that the sponsor, household member, or joint sponsor may verify the accuracy of the request, the request for reimbursement must include an itemized statement supporting the claim for reimbursement. The request for reimbursement must also include a notification to the sponsor, household (v) Prior to filing a lawsuit against a sponsor, household member, or joint sponsor to enforce the sponsor, household member, or joint sponsor's support obligation under section 213A(b)(2) of the Act, a Federal, state, or local gover

official document · source cfr-2024

Actions for violating an order or for disruptive conduct.

CFR · 2024-01-01 · US · Title 42

(a) The ALJ may take action against any party in the proceeding for violating an order or procedure or for other conduct that interferes with the prompt, orderly, or fair conduct of the hearing. Any action imposed upon a party must reasonably relate to the severity and nature of the violation or disruptive conduct. (b) The actions may include— (1) Prohibiting a party from introducing certain evidence or otherwise supporting a particular claim or defense; (2) Striking pleadings, in whole or in part; (3) Staying the proceedings; (4) Entering a decision by default; (5) Refusing to consider any motion or other action not timely filed; or (6) Drawing the inference that spoliated evidence was unfavorable to the party responsible for its spoliation.

official document · source cfr-2024

Actions for which Safety Integration Plan is required.

CFR · 2024-01-01 · US · Title 49

A SIP shall be filed by any applicant requesting authority to undertake a transaction as defined under § 1106.2 of this part.

official document · source cfr-2024

Actions for which sanctions may be imposed.

CFR · 2024-01-01 · US · Title 24

Results of monitoring or other reviews may serve as the basis for the Commissioner's imposing sanctions on the HFA. Violations for which sanctions may be imposed include, but are not limited to: (a) Commission of fraud or making a material misrepresentation by the HFA with respect to any mortgage insured or to any other matter under this part. (b) Assignment or transfer of interest in any insured mortgage not in accord with the requirements of this part. (c) Engagement in business practices that do not conform to generally accepted practices of prudent lenders or that demonstrate irresponsibility. (d) Actions or conduct for which sanctions may be imposed against the HFA by HUD's Mortgagee Review Board under 24 CFR 25.9, which pertains to “notice of administrative action”. (e) Failure to: (1) Reveal in its application for participation in the program all the information required by this part; (2) Notify HUD in a timely manner of any pending or actual changes that would adversely affect HFA operations or financial status; (3) Comply with all eligibility requirements for participation in the program; (4) Issue debentures in the event of an initial claim payment by HUD, or to reimburse HUD for payment of a claim; (5) Maintain an issuer credit rating of “A” or better, or an equivalent designation, or overall rating of “A” on general obligation bonds (or if such rating is lost, comply with paragraph (e)(6) of this section); (6) Establish and maintain a dedicated account, if require

official document · source cfr-2024

Actions in response to AMS malfunction, alert, or alarm signals.

CFR · 2024-01-01 · US · Title 30

(a) When a malfunction, alert, or alarm signal is received at the designated surface location, the sensor(s) that are activated must be identified and the AMS operator must promptly notify appropriate personnel. (b) Upon notification of a malfunction, alert, or alarm signal, appropriate personnel must promptly initiate an investigation to determine the cause of the signal and take the required actions set forth in paragraphs (c), (d), or (e) of this section. (c) If any sensor installed in accordance with §§ 75.340(a)(1)(ii), 75.340(a)(2)(ii), 75.350(b), or 75.350(d) indicates an alarm or if any two consecutive sensors indicate alert at the same time, the following procedures must be followed unless the cause of the signal(s) is known not to be a hazard to miners: (1) Appropriate personnel must notify miners in affected working sections, in affected areas where mechanized mining equipment is being installed or removed, and at other locations specified in the § 75.1502 approved mine emergency evacuation and firefighting program of instruction; and (2) All personnel in the affected areas, unless assigned other duties under § 75.1502, must be withdrawn promptly to a safe location identified in the mine emergency evacuation and firefighting program of instruction. (d) If there is an alert or alarm signal from a methane sensor installed in accordance with §§ 75.323(d)(1)(ii) and 75.362(f), an investigation must be initiated to determine the cause of the signal, and the actions requ

official document · source cfr-2024

Actions involving discrimination.

CFR · 2024-01-01 · US · Title 5

Section 7702 of title 5, U.S. Code, is modified to read “MSPB or MRP” wherever the terms “Merit Systems Protection Board” or “Board” are used.

official document · source cfr-2024

Actions normally requiring an EA.

CFR · 2024-01-01 · US · Title 32

The following Army actions normally require an EA, unless they qualify for the use of a CX: (a) Special field training exercises or test activities in excess of five acres on Army land of a nature or magnitude not within the annual installation training cycle or installation master plan. (b) Military construction that exceeds five contiguous acres, including contracts for off-post construction. (c) Changes to established installation land use that generate impacts on the environment. (d) Alteration projects affecting historically significant structures, archaeological sites, or places listed or eligible for listing on the National Register of Historic Places. (e) Actions that could cause significant increase in soil erosion, or affect prime or unique farmland (off Army property), wetlands, floodplains, coastal zones, wilderness areas, aquifers or other water supplies, prime or unique wildlife habitat, or wild and scenic rivers. (f) Actions proposed during the life cycle of a weapon system if the action produces a new hazardous or toxic material or results in a new hazardous or toxic waste, and the action is not adequately addressed by existing NEPA documentation. Examples of actions normally requiring an EA during the life cycle include, but are not limited to, testing, production, fielding, and training involving natural resources, and disposal/demilitarization. System design, development, and production actions may require an EA, if such decisions establish precedent (or ma

official document · source cfr-2024

Actions normally requiring an EIS.

CFR · 2024-01-01 · US · Title 14

(a) NASA will prepare an EIS for actions with the potential to significantly impact the quality of the human environment, including actions for which an EA analysis demonstrates that significant impacts will potentially occur which will not be reduced or eliminated by changes to the proposed action or mitigation of its potentially significant impacts. (b) Typical NASA actions normally requiring an EIS include: (1) Development and operation of new launch vehicles or space transportation systems. (2) [Reserved] (c) Development and operation of a space flight project/program which would launch and operate a nuclear reactor or radioisotope power systems and devices using a total quantity of radioactive material greater than the quantity for which the NASA Nuclear Flight Safety Assurance Manager may grant nuclear safety launch approval ( (d) Development and operation of a space flight project/program which would return samples to Earth from solar system bodies (such as asteroids, comets, planets, dwarf planets, and planetary moons), which would likely receive a Restricted Earth Return categorization (as defined in Appendix A to this subpart) from the NASA Planetary Protection Office or the NASA Planetary Protection Subcommittee. (e) Substantial modification of a NASA facility's master plan in a manner expected to result in significant effect(s) on the quality of the human environment. (f) Substantial construction projects expected to result in significant effect(s) on the quality

official document · source cfr-2024

Actions normally requiring an EIS.

CFR · 2024-01-01 · US · Title 32

The following actions normally require an EIS: (a) Significant expansion of a military facility or installation. (b) Construction of facilities that have a significant effect on wetlands, coastal zones, or other areas of critical environmental concern. (c) The disposal of nuclear materials, munitions, explosives, industrial and military chemicals, and other hazardous or toxic substances that have the potential to cause significant environmental impact. (d) Land acquisition, leasing, or other actions that may lead to significant changes in land use. (e) Realignment or stationing of a brigade or larger table of organization equipment (TOE) unit during peacetime (except where the only significant impacts are socioeconomic, with no significant biophysical environmental impact). (f) Training exercises conducted outside the boundaries of an existing military reservation where significant environmental damage might occur. (g) Major changes in the mission or facilities either affecting environmentally sensitive resources (see § 651.29(c)) or causing significant environmental impact (see § 651.39).

official document · source cfr-2024

Actions normally requiring an EIS.

CFR · 2024-01-01 · US · Title 33

Actions normally requiring an EIS are: (a) Feasibility reports for authorization and construction of major projects; (b) Proposed changes in projects which increase size substantially or add additional purposes; and (c) Proposed major changes in the operation and/or maintenance of completed projects. District commanders may consider the use of an environmental assessment (EA) on these types of actions if early studies and coordination show that a particular action is not likely to have a significant impact on the quality of the human environment.

official document · source cfr-2024

Actions normally requiring an EIS.

CFR · 2024-01-01 · US · Title 43

(a) The following proposals will normally require the preparation of an EIS: (1) Establishment of major new refuges or wildlife management areas, fish hatcheries, and major additions to such installations. (2) Master development and/or management plans for major new installations. (3) Management plans for established installations where major new developments or substantial changes in management practices are proposed. (b) If for any of these proposals it is initially decided not to prepare an EIS, an EA will be prepared in accordance with 40 CFR 1501.4(e)(2).

official document · source cfr-2024

Actions normally requiring an Environmental Assessment (EA) but not necessarily an EIS.

CFR · 2024-01-01 · US · Title 33

Actions normally requiring an EA, but not an EIS, are listed below: (a) (b) (c) (1) Section 205, Small Flood Control Authority; (2) Section 208, Snagging and Clearing for Flood Control Authority; (3) Section 107, Small Navigation Project Authority; (4) Section 103, Small Beach Erosion Control Project Authority; and (5) Section 111, Mitigation of Shore Damages Attributable to Navigation Projects. (d) (e) (2) Disposal of real property for public port and industrial purposes. (3) Grants of leases or easements for other than minor oil and gas transmission lines, electric power transmission lines, road and highway rights-of-way, and sewage or water treatment facilities and land fills.

official document · source cfr-2024

Actions normally requiring an environmental assessment.

CFR · 2024-01-01 · US · Title 7

The following actions normally will require an EA: (a) Programs supported in whole or in part by NIFA which may result in a particular technology's moving from the field evaluation stage to large- (b) Field work that is expected to have an effect on the human environment such as large-scale excavations or the use of explosives. (c) Projects for the construction or renovation of physical facilities, unless categorically excluded under § 3407.6(a)(2)(ii). (d) Activities specified in § 3407.6(b).

official document · source cfr-2024

Actions normally requiring an environmental impact statement.

CFR · 2024-01-01 · US · Title 7

An EIS normally will be required for major actions where it is determined by NIFA that such activity will significantly affect the quality of the human environment, including those specified in § 3407.6(b).

official document · source cfr-2024

Actions not subject to administrative appeal.

CFR · 2024-01-01 · US · Title 10

A Notice of Probable Violation, Notice of Proposed Disallowance, Proposed Remedial Order or Interim Remedial Order for Immediate Compliance issued pursuant to this subpart shall not be an action from which there may be an administrative appeal pursuant to subpart H. In addition, a determination by the Office of Hearings and Appeals that a Remedial Order, an Order of Disallowance, or a Remedial Order for Immediate Compliance should not be issued shall not be appealable pursuant to subpart H.

official document · source cfr-2024

Actions on appeal under the National Guard Claims Act.

CFR · 2024-01-01 · US · Title 32

The provisions of § 536.79 apply to claims arising under this subpart.

official document · source cfr-2024

Actions on appeals.

CFR · 2024-01-01 · US · Title 14

(a) Except as provided in § 1206.403, the Administrator or designee, or in the case of records as specified in § 1206.805, the Inspector General or designee, shall make a final determination on an appeal and notify the appellant thereof, within 20 working days after the receipt of the appeal by the Administrator's Office. (b) In “unusual circumstances” as defined in § 1206.403, the time limit for a final determination may be extended, but not to exceed a total of 10 working days in the aggregate in the processing of any specific appeal for an Agency record. The extension must be taken before the expiration of the 20 working day time limit. The appellant will be notified in writing in accordance with § 1206.403. (c) If processing time will exceed or is expected to exceed 30 working days, the appellant will be notified of the delay in processing and the reason for the delay. (d) If the final determination reverses in whole or in part the initial determination, the record requested (or portions thereof) shall be made available promptly to the requester, as provided in the final determination. (e) If a reversal in whole or in part of the initial determination requires additional document search or production, associated fees will be applicable in accordance with fee guidance in this regulation. (f) If the final determination sustains in whole or in part an adverse initial determination, the notification of the final determination shall: (1) Explain the basis on which the record (

official document · source cfr-2024

Actions on attestations submitted for filing for locations in Alaska.

CFR · 2024-01-01 · US · Title 20

Once an attestation has been received from an employer, a determination shall be made by the Certifying Officer whether to accept the attestation for filing or return it. The Certifying Officer may request additional explanation and/or documentation from the employer in making this determination. An attestation which is properly filled out and which includes accompanying documentation for the requirement set forth at § 655.537 of this part shall be accepted for filing by ETA on the date it is signed by the Certifying Officer unless it falls within one of the categories set forth in paragraph (b) of this section. Once an attestation is accepted for filing, ETA shall then follow the procedures set forth in paragraph (a)(1) of this section. Upon acceptance of the employer's attestation by ETA, the attestation and accompanying documentation shall be forwarded to and be available for public examination at the ETA national office (a) (2) DOL is not the guarantor of the accuracy, truthfulness or adequacy of an attestation accepted for filing. (b) (1) When the Form ETA 9033-A is not properly filled out. Examples of improperly filled out Form ETA 9033-A's include instances where the employer has neglected to check all the necessary boxes, where the employer has failed to include the name of any port, city, or other geographical reference point where longshore work is to be performed, or where the employer has failed to sign the attestation or to designate an agent in the United States

official document · source cfr-2024

Actions on requests.

CFR · 2024-01-01 · US · Title 45

(a) The Administrative Officer or any employee acting in that official's capacity will determine within twenty days (excepting Saturdays, Sundays, and legal public holidays) after the receipt of any a request whether to comply with the request. Upon receipt of a request for a Commission record which is available, the Administrative Officer or other employee will notify the requester as to the time the record is available, and will promptly make the record available after advising the requester of the applicable fees under § 502.13. The person making the request will be notified immediately after any adverse determination, the reasons for making the adverse determination and the right of the person to appeal. (b) Any denial of a request for a record will be written and signed by the Administrative Officer or other employee, including a statement of the reason for denial. That statement will contain, as applicable: (1) A reference to the specific exemption under the Freedom of Information Act authorizing the withholding of a record, and to the extent consistent with the purpose of the exemption, an explanation of how the exemption applies to the record withheld. (2) If a record requested does not exist, or has been legally disposed of, the requester will be so notified. (c) In unusual circumstances, the time limit prescribed in paragraph (a) of this section may be extended by written notice to the person making the request setting forth the reasons for the extension and the dat

official document · source cfr-2024

Actions on the policy.

CFR · 2024-01-01 · US · Title 38

The Assistant Director for Insurance will furnish the name and address of the insuring company upon written request of a member of the uniformed services or his or her beneficiary. Actions at law or in equity to recover on the policy, in which there is not alleged any breach of any obligation undertaken by the United States, should be brought against the insurer.

official document · source cfr-2024

Actions on the recommendations.

CFR · 2024-01-01 · US · Title 10

(a) Upon receipt of the findings and recommendation from the Hearing Examiner, and the record, the Director, Office of Administration, shall forthwith transmit it to the Deputy Executive Director for Materials, Waste, Research, State, Tribal, Compliance, Administration, and Human Capital Programs who has the discretion to return the record to the Director, Office of Administration, for further proceedings by the Hearing Examiner with respect to specific matters designated by the Deputy Executive Director for Materials, Waste, Research, State, Tribal, Compliance, Administration, and Human Capital Programs. (b)(1) In the event of a recommendation by the Hearing Examiner that an individual's access authorization and/or employment clearance be denied or revoked, the Deputy Executive Director for Materials, Waste, Research, State, Tribal, Compliance, Administration, and Human Capital Programs shall immediately notify the individual in writing of the Hearing Examiner's findings with respect to each allegation contained in the notification letter, and that the individual has a right to request a review of his or her case by the NRC Personnel Security Review Panel and of the right to submit a brief in support of his or her contentions. The request for a review must be submitted to the Deputy Executive Director for Materials, Waste, Research, State, Tribal, Compliance, Administration, and Human Capital Programs within five days after the receipt of the notice. The brief will be forwar

official document · source cfr-2024

Actions outside of meetings.

CFR · 2024-01-01 · US · Title 45

Between meetings in situations of emergency, the Commission may act through a canvass by the Secretary of individual members, provided that any action so taken is brought up and ratified at the next meeting. In addition,

official document · source cfr-2024

Actions permitted by international treaty, convention, or agreement.

CFR · 2024-01-01 · US · Title 50

The MMPA and these regulations shall not apply to the extent that they are inconsistent with the provisions of any international treaty, convention or agreement, or any statute implementing the same relating to the taking or importation of marine mammals or marine mammal products, which was existing and in force prior to December 21, 1972, and to which the United States was a party. Specifically, the regulations in subpart B of this part and the provisions of the MMPA shall not apply to activities carried out pursuant to the Interim Convention on the Conservation of North Pacific Fur Seals signed at Washington on February 9, 1957, and the Fur Seal Act of 1966, 16 U.S.C. 1151 through 1187, as in each case, from time to time amended.

official document · source cfr-2024

Actions permitted by international treaty, convention, or agreement.

CFR · 2024-01-01 · US · Title 50

The Act and these regulations shall not apply to the extent that they are inconsistent with the provisions of any international treaty, convention or agreement, or any statute implementing the same, relating to the taking or importation of marine mammals or marine mammal products, which was existent and in force prior to December 21, 1972, and to which the United States was a party. Specifically, the regulations in subpart B of this part and the provisions of the Act shall not apply to activities carried out pursuant to the Interim Convention on the Conservation of North Pacific Fur Seals signed in Washington on February 9, 1957, and the Fur Seal Act of 1966, 16 U.S.C. 1151-1187, as, in each case, from time to time amended.

official document · source cfr-2024

Actions prior to loan closing and start of construction.

CFR · 2024-01-01 · US · Title 7

(a) (b) (c) (d) (e) (f)

official document · source cfr-2024

Actions prior to loan or grant closing or start of construction, whichever occurs first.

CFR · 2024-01-01 · US · Title 7

(a) Applicants must provide evidence of adequate insurance and fidelity or employee dishonesty bond coverage. (b) (c) (d) (e) (f) (g) (1) (i) The applicant must provide a legal opinion relative to the title to rights-of-way and easements. Form RD 442-22, “Opinion of Counsel Relative to Rights-of-Way,” may be used. When a site is for major structures such as a reservoir or pumping station and the applicant is able to obtain only a right-of-way or easement on such a site rather than a fee simple title, the applicant will furnish a title report thereon by the applicant's attorney showing ownership of the land and all mortgages or other lien defects, restrictions, or encumbrances, if any. (ii) For user connections funded by RUS, applicants will obtain adequate rights to construct and maintain the connection line or other facilities located on the user's property. This right may be obtained through formal easement or user agreements. (2) (i) In lieu of receiving title opinions from the applicant's attorney, the applicant may use a title insurance company. If a title insurance company is used, the applicant must provide the Agency a title insurance binder, disclosing all title defects or restrictions, and include a commitment to issue a title insurance policy. The policy should be in an amount at least equal to the market value of the property as improved. The title insurance binder and commitment should be provided to the Agency prior to requesting closing instructions. The Agency

official document · source cfr-2024

Actions prior to termination.

CFR · 2024-01-01 · US · Title 42

(a) (i) Provide a warning notice to the ACO regarding noncompliance with one or more program requirements. (ii) Request a CAP from the ACO. (iii) Place the ACO on a special monitoring plan. (2) Nothing in this part, including the actions set forth in paragraph (a)(1) of this section, negates, diminishes, or otherwise alters the applicability of other laws, rules, or regulations, including, but not limited to, the Sherman Act (15 U.S.C. 1 (b) (i) The CAP must address what actions the ACO will take to ensure that the ACO, ACO participants, ACO providers/suppliers or other individuals or entities performing functions or services related to the ACO's activities or both correct any deficiencies and comply with all applicable Shared Savings Program requirements. (ii) The ACO's performance will be monitored and evaluated during and after the CAP process. (2) CMS may terminate the participation agreement if the ACO fails to submit, obtain approval for, or implement a CAP, or fails to demonstrate improved performance upon completion of the CAP.

official document · source cfr-2024

Actions prohibited by employer.

CFR · 2024-01-01 · US · Title 29

An employer may not discharge, refuse to employ, or take disciplinary action against the debtor due to the issuance of a withholding order under this subpart.

official document · source cfr-2024

Actions prohibited by the employer.

CFR · 2024-01-01 · US · Title 41

An employer may not discharge, refuse to employ, or take disciplinary action against the debtor due to the issuance of a withholding order under this part. See 31 U.S.C. 3720D(e).

official document · source cfr-2024

Actions related to removal, revocation and/or reinstatement.

CFR · 2024-01-01 · US · Title 10

(a) (1) Identifies, during the course of the management evaluation, a safety or security concern that warrants such removal based on one or more of the types of behaviors and conditions identified in § 712.13(c); (2) Receives a supervisor's written notice of the immediate removal of an HRP-certified individual; or (3) Receives a recommendation from the Designated Physician, the Designated Psychologist, or the SOMD to medically remove an HRP-certified individual consistent with § 712.14(h). (b) The temporary removal of an HRP-certified individual from HRP duties pending a determination of the individual's reliability is an interim, precautionary action and does not constitute a determination that the individual is not fit to perform his or her required duties. Removal is not, in itself, cause for loss of pay, benefits, or other changes in employment status. Immediately upon directing a temporary removal, the HRP management official must notify the supervisor to take appropriate actions consistent with an immediate removal. Within five (5) business days of placing the individual on a temporary removal, the HRP management official must notify the individual in writing that s/he is temporarily removed. (c) If temporary removal is based on derogatory information that is a security concern, the HRP management official must notify the HRP certifying official and the applicable DOE personnel security office. (d) If temporary removal is based on a medical concern, the HRP management o

official document · source cfr-2024

Actions related to technology.

CFR · 2024-01-01 · US · Title 40

Discharge technology should be adapted to the needs of each site. In determining whether the discharge operation sufficiently minimizes adverse environmental impacts, the applicant should consider: (a) Using appropriate equipment or machinery, including protective devices, and the use of such equipment or machinery in activities related to the discharge of dredged or fill material; (b) Employing appropriate maintenance and operation on equipment or machinery, including adequate training, staffing, and working procedures; (c) Using machinery and techniques that are especially designed to reduce damage to wetlands. This may include machines equipped with devices that scatter rather than mound excavated materials, machines with specially designed wheels or tracks, and the use of mats under heavy machines to reduce wetland surface compaction and ­rutting; (d) Designing access roads and channel spanning structures using culverts, open channels, and diversions that will pass both low and high water flows, accommodate fluctuating water levels, and maintain circulation and faunal movement; (e) Employing appropriate machinery and methods of transport of the material for discharge.

official document · source cfr-2024

Actions required after acquisition of property.

CFR · 2024-01-01 · US · Title 7

The approval official may employ the services of local designated attorneys, of a case by case basis, to process all legal procedures necessary to clear the title of foreclosure properties. Such attorneys shall be compensated at not more than their usual and customary charges for such work. Contracting for such attorneys shall be accomplished pursuant to the Federal acquisition regulations and related procurement regulations and guidance. (a)-(d) [Reserved] (e) (i) In a voluntary conveyance case where the debt exceeds the market value of the property and the borrower is (ii) In a foreclosure where the bid is less than the account balance and a deficiency judgment will be sought for the difference, in which case the account credit will be the amount of Rural Development's bid. (2) (i) In a voluntary conveyance case: (A) Where the market value of the property equals or exceeds the debt or where the borrower is released from liability for any difference, the account will be satisfied. (B) Where the debt exceeds the market value of the property and the borrower is (ii) In a foreclosure, the account credit will be the amount of Rural Development's bid (3) (4) (i) If the market value of the acquired property equals or exceeds the debt, the account will be satisfied. (ii) If the debt exceeds the market value of the acquired property, the account credit will be the market value. (f)-(l) [Reserved]

official document · source cfr-2024

Actions required by agents.

CFR · 2024-01-01 · US · Title 32

(a) The agent must know that— (1) Soldiers to be solicited are in grades E-1, E-2, or E-3, and (2) The solicitation of these members is restricted to specified times and locations designated by the installation commander. (b) Agents must leave information on the policy applied for with each member in grades E-1, E-2, and E-3 who applies for insurance and the unit insurance officer or counselor. Agents must complete DA Form 2056 (Commercial Insurance Solicitation Record). Blank DA Forms 2056 (not allotment forms) will be available to insurance agents on request. In the “Remarks” section of DA Form 2056, agents will include all pertinent information and a clear statement that dividends are not guaranteed if the presentation refers to dividends.

official document · source cfr-2024

Actions required for certain deposit accounts with transactional features.

CFR · 2024-01-01 · US · Title 12

(a) For each deposit account with transactional features for which the covered institution maintains its deposit account records in accordance with § 370.4(b)(1), a covered institution must take steps reasonably calculated to ensure that the account holder will provide to the FDIC the information needed for the covered institution's information technology system to perform the functions set forth in § 370.3(b). At a minimum, “steps reasonably calculated” shall include: (1) A good faith effort to enter into contractual arrangements with the account holder that obligate the account holder to deliver information needed for deposit insurance calculation to the FDIC in a format compatible with the covered institution's information technology system within a timeframe sufficient to allow the covered institution's information technology system to perform the functions set forth in § 370.3(b) within 24 hours after the appointment of the FDIC as receiver in order for the account holder to have access to deposits on the next business day after failure; and (2) Regardless of whether the covered institution and the account holder enter into contractual arrangements as set forth in paragraph (a)(1) of this section, the covered institution providing the account holder with: (i) A written disclosure specifying the information and format requirements of its information technology system and stating that the account holder may not have access to deposits in its deposit account before delivery

official document · source cfr-2024

Actions required to be logged.

CFR · 2024-01-01 · US · Title 46

The actions and observations noted in this section shall be entered in the official log book. This section contains no requirements which are not made in other portions of this subchapter, the items being merely grouped together for convenience. (a) Onboard training, musters, and drills: held in accordance with subchapter W (Lifesaving Appliances and Arrangements) of this chapter. (b) Watertight door operation: Daily and Weekly. See § 78.17-3. (c) Valve and closing appliance operation: Weekly. See § 78.17-5. (d) Loudspeaker system: Weekly. See § 78.17-10. (e) Steering gear, whistle, and means of communication: Prior to departure. See § 78.17-15. (f) Drafts and load line markings: Prior to leaving port, ocean, coastwise, and Great Lakes services only. See § 78.17-20. (g) Verification of vessel compliance with applicable stability requirements. After loading and prior to departure and at all other time necessary to assure the safety of the vessel. See § 78.17-22. (h) Loading doors. Where applicable, every closing and any opening when not docked. See § 78.17-33. (i) Hatches and other openings: All openings and closings, or leaving port without closing, except vessels on protected waters. See § 78.17-35. (j) Emergency lighting and power systems: Weekly and semiannually. See § 78.17-45. (k) Smoke Detecting System: Once every three months. See § 78.17-65. (l) Fuel oil data: Upon receipt of fuel oil on board. See § 78.17-75. (m) Cargo gear inspections: At least once a month. See § 7

official document · source cfr-2024

Actions required to be logged.

CFR · 2024-01-01 · US · Title 46

The actions and observations noted in this section shall be entered in the official log book. This section contains no requirements which are not made in other portions of this subchapter, the items being merely grouped together for convenience. (a) Onboard training, musters, and drills: held in accordance with subchapter W (Lifesaving appliances and Arrangements) of this chapter. (b) Steering Gear, Whistle, and Means of Communication. Prior to departure. See § 97.15-3. (c) Drafts and Load Line Markings. Prior to leaving port, ocean, coastwise, and Great Lakes services only. See § 97.15-5. (d) Verification of vessel compliance with applicable stability requirements. After loading and prior to departure and at all other times necessary to assure the safety of the vessel. See § 97.15-7. (e) Loading doors. Where applicable, every closing and any opening when not docked. See § 97.15-17. (f) Hatches and other openings. All openings and closings, or leaving port without closing. Except vessels on protected waters. See § 97.15-20. (g) Emergency Lighting and Power Systems. Weekly and semi-annually. See § 97.15-30. (h) Fuel oil data: Upon receipt of fuel oil on board. See § 97.15-55. (i) Cargo gear inspections: At least once a month. See § 91.37-70 of this subchapter. (j) Inflatable hopper gate seals. Where installed to comply with subpart G of part 172 of this chapter after each carriage of cargo. See § 97.15-75.

official document · source cfr-2024

Actions required to be logged.

CFR · 2024-01-01 · US · Title 46

The actions and observations noted in this section shall be entered in the official logbook. This section contains no requirements which are not made in other portions of this subchapter, the items being merely grouped together for convenience. (a) Onboard training, musters, and drills: held in accordance with subchapter W (Lifesaving Appliances and Arrangements) of this chapter. (b) Steering gear, whistle, and means of communication. Prior to departure. See § 196.15-3. (c) Drafts and load line marks. Prior to leaving port, ocean, coastwise, and Great Lakes service only. See § 196.15-5. (d) Verification of vessel compliance with applicable stability requirements. After loading and prior to departure and at all other times necessary to assure the safety of the vessel. See § 196.15-7. (e) Loading doors. Where applicable, every closing and any opening when not docked. See § 196.15-18. (f) Emergency lighting and power systems. Weekly and semiannually. See § 196.15-30. (g) Fuel oil data: Upon receipt of fuel oil on board. See § 196.15-55. (h) Hatches and other openings. All openings and closings required by § 196.15-20. (i) Magazines and magazine chests. Maximum and minimum temperatures as required by § 196.85-1(b). (j) Portable vans, prior to departure. See § 195.11-25(e) of this subchapter. (k) Weight handling gear, prior to departure. See § 189.35-13(b) of this subchapter.

official document · source cfr-2024

Actions required to be logged—TB/ALL.

CFR · 2024-01-01 · US · Title 46

(a) (b) (1) Onboard training, musters, and drills: held in accordance with subchapter W (Lifesaving Appliances or Arrangements) of this chapter. (2) Draft and load line marks. For tankships of 150 gross tons and over, prior to leaving port for ocean, coastwise, and Great Lakes voyages only. See § 35.20-5. (3) Verification of vessel compliance with applicable stability requirements. After loading and prior to departure and at all other times necessary to assure the safety of the vessel. See § 35.20-7. (4) Steering gear tests. Prior to departure, or for tank ships on voyages of less than 48 hours duration or tankships operating on lakes, bays, sounds and rivers, once every week. See § 35.20-10. (5) Fuel oil data. Upon receipt of fuel oil on board to be used as fuel. See § 35.25-10. (6) Inspections and tests of firefighting equipment. Once every year. See § 31.10-18 of this subchapter. (7) Operation and inspection of the emergency lighting and power systems. Once in each week that the vessel is navigated. See § 35.10-15. (8) Cargo gear inspections: At least once a month. See § 31.37-70 of this subchapter. (c) (1) Inspections and tests of firefighting equipment. Once every year. See § 31.10-18 of this subchapter. (2) Draft and load line marks. For tank barges of 150 gross tons and over, prior to leaving port for ocean, coastwise, and Great Lakes voyages only. (3) Cargo gear inspections: At least once a month. See § 31.37-70 of this subchapter. (4) Verification of vessel complianc

official document · source cfr-2024

Actions required.

CFR · 2024-01-01 · US · Title 48

(a) Services or products. (b) Research, development, or test projects. (c) Transportation of hazardous materials. (d) Construction, including construction of facilities on the contractor's premises.

official document · source cfr-2024

Actions requiring an environmental assessment and categorical exclusions.

CFR · 2024-01-01 · US · Title 45

(a) The types of actions to be classified as “major Federal actions” subject to NEPA procedures are discussed generally in the CEQ regulations. Paragraph (b) of this section describes various classes of NSF actions that normally require the preparation of an environmental assessment or an EIS, and those classes that are categorically excluded. (Categorical exclusion is defined at 40 CFR 1508.4.) The word “normally” is stressed; there may be individual cases in which specific factors require contrary action. NSF directorates and offices are responsible for identifying situations in which an environmental assessment or an EIS should be prepared even if not normally required by paragraph (b) of this paragraph. (b) Most NSF awards support individual scientific research projects and are not “major Federal actions significantly affecting the quality of the human environment” except in the sense that the long term effect of the accumulation of human knowledge is likely to affect the quality of the human environment. However, such long term effects are basically speculative and unknowable in advance; thus they normally do not provide a sufficient basis for classifying research as subject to NEPA (See 40 CFR 1508.8) and are categorically excluded from an environmental assessment. Nevertheless, in some cases the actual procedures used in carrying out the research may have potential environmental effects, particularly where the project requires construction of facilities or major distur

official document · source cfr-2024

Actions requiring environmental analysis.

CFR · 2024-01-01 · US · Title 32

The general types of proposed actions requiring environmental impact analysis under NEPA, unless categorically excluded or otherwise included in existing NEPA documentation, include: (a) Policies, regulations, and procedures (for example, Army and installation regulations). (b) New management and operational concepts and programs, including logistics; RDT&E; procurement; personnel assignment; real property and facility management (such as master plans); and environmental programs such as Integrated Natural Resource Management Plan (INRMP), Integrated Cultural Resources Management Plan (ICRMP), and Integrated Pest Management Plan. NEPA requirements may be incorporated into other Army plans in accordance with 40 CFR 1506.4. (c) Projects involving facilities construction. (d) Operations and activities including individual and unit training, flight operations, overall operation of installations, or facility test and evaluation programs. (e) Actions that require licenses for operations or special material use, including a Nuclear Regulatory Commission (NRC) license, an Army radiation authorization, or Federal Aviation Administration air space request (new, renewal, or amendment), in accordance with AR 95-50. (f) Materiel development, operation and support, disposal, and/or modification as required by DOD 5000.2-R. (g) Transfer of significant equipment or property to the ARNG or Army Reserve. (h) Research and development including areas such as genetic engineering, laser testing, a

official document · source cfr-2024

Actions requiring environmental assessments.

CFR · 2024-01-01 · US · Title 14

(a) The Responsible Official will prepare an EA when a proposed action cannot be categorically excluded, and the proposed action is not expected to result in impacts that require analysis in an EIS. The Responsible Official will consider the scope of the action and the context and intensity of any environmental impacts when determining whether to prepare an EA. (b) Typical NASA actions normally requiring an EA include: (1) Specific spacecraft development and space flight projects/programs (as defined in Appendix A to this subpart). (2) Actions altering the ongoing operations at a NASA Center which could lead directly, indirectly, or cumulatively to substantial natural or physical environmental impacts. (3) Construction or modifications of facilities which are not minor. (4) Proposed actions that are expected to result in significant changes to established land use. (5) A space flight project/program that would return extraterrestrial samples to Earth from solar system bodies (such as asteroids, comets, planets, dwarf planets, and planetary moons), which would likely receive an Unrestricted Earth Return categorization (as defined in Appendix A to this subpart) from NASA's Planetary Protection Office (PPO) or the NASA Planetary Protection Subcommittee prior to the return of samples to the Earth.

official document · source cfr-2024

Actions requiring environmental review.

CFR · 2024-01-01 · US · Title 7

(a) The Agency must comply with the requirements of NEPA for all Federal actions within the: (1) United States borders and any other commonwealth, territory or possession of the United States such as Guam, American Samoa, U.S. Virgin Islands, the Commonwealth of the Northern Mariana Islands, and the Commonwealth of Puerto Rico; and (2) Republic of the Marshall Islands, the Federated States of Micronesia and the Republic of Palau, subject to applicable Compacts of Free Association. (b) Except as provided in paragraphs (c), (d), and (e) of this section, the provisions of this part apply to administrative actions by the Agency with regard to the following to be Federal actions: (1) Providing financial assistance; (2) Certain post-financial assistance actions with the potential to have an effect on the environment, including: (i) The sale or lease of Agency-owned real property; (ii) Lien subordination; and (iii) Approval of a substantial change in the scope of a project receiving financial assistance not previously considered. (3) Promulgation of procedures or regulations for new or significantly revised programs; and (4) Legislative proposals (see 40 CFR 1506.8). (c) For environmental review purposes, the Agency has identified and established categories of proposed actions (§§ 1970.53 through 1970.55, 1970.101, and 1970.151). An applicant may propose to participate with other parties in the ownership of a project. In such a case, the Agency will determine whether the applicant p

official document · source cfr-2024

Actions requiring preparation of an environmental assessment.

CFR · 2024-01-01 · US · Title 21

Any proposed action of a type specified in this section normally requires at least the preparation of an EA, unless it is an action in a specific class that qualifies for exclusion under §§ 25.30, 25.31, 25.32, 25.33, 25.34, or 25.35: (a) Major recommendations or reports made to Congress on proposals for legislation in instances where the agency has primary responsibility for the subject matter involved. (b) Destruction or other disposition of articles condemned after seizure or whose distribution or use has been enjoined, unless categorically excluded in §§ 25.30(d) or 25.32(h). (c) Destruction or other disposition of articles following detention or recall at agency request, unless categorically excluded in §§ 25.30(d) or 25.32(h). (d) Disposition of FDA laboratory waste materials, unless categorically excluded in § 25.30(m). (e) Intramural and extramural research supported in whole or in part through contracts, other agreements, or grants, unless categorically excluded in § 25.30 (e) or (f). (f) Establishment by regulation of labeling requirements, a standard, or a monograph, unless categorically excluded in §§ 25.30(k) or 25.31 (a), (b), (c), (h), (i), or (j), or 25.32 (a) or (p). (g) Issuance, amendment, and enforcement of FDA regulations, or an exemption or variance from FDA regulations, unless categorically excluded (h) Withdrawal of existing approvals of FDA-approved articles, unless categorically excluded in §§ 25.31 (d) or (k), 25.32(m), or 25.33 (g) or (h). (i) Appr

official document · source cfr-2024

Actions requiring the preparation of an environmental impact statement.

CFR · 2024-01-01 · US · Title 21

(a) There are no categories of agency actions that routinely significantly affect the quality of the human environment and that therefore ordinarily require the preparation of an EIS. (b) EIS's are prepared for agency actions when evaluation of data or information in an EA or otherwise available to the agency leads to a finding by the

official document · source cfr-2024

Actions resulting from assessment.

CFR · 2024-01-01 · US · Title 45

(a) (b) (c) (d) (e)

official document · source cfr-2024

Actions subject to categorical exclusion.

CFR · 2024-01-01 · US · Title 43

(a) General categorical exclusions. The following actions are categorical exclusions (CX). However, environmental documents will be prepared for individual actions subject to CX if the exceptions listed in Sec. 10010.62 apply. (1) Personnel actions and investigations and personnel services contracts. (2) Internal organizational charges and facility and office reductions and closings. (3) Routine financial transactions, including such things as salaries and expenses, procurement contracts, guarantees, financial assistance, income transfers, audits, fees, bonds and royalties. (4) Legal transactions, including such things as investigations, patents, claims, legal opinions, and judicial activities including their initiation, processing, settlement, appeal or compliance. (5) Monitoring actions, including inspections, assessments, administrative hearings and decisions; when the regulations themselves or the instruments of regulations (leases, permits, licenses, etc.) have previously been covered by the NEPA process or exempt from it. (6) Non-destructive data collection, inventory (including field, aerial and satellite surveying and mapping), study, and research activities. (7) Routine and continuing government business, including such things as supervision, administration, activities having limited context and intensity, for example, activities of limited size and magnitude of short-term effects. (8) Management formulation, allocation, transfer and reprogramming of the Commission's

official document · source cfr-2024

Actions subjecting persons to civil penalties (Rule 1503).

CFR · 2024-01-01 · US · Title 18

(a) The actions that subject persons to civil penalties are violations of: (1) Any rule or regulation issued under Part I of the Federal Power Act; (2) Any term or condition of a license or permit issued under Part I of the Federal Power Act or an exemption issued from any provision of Part I of the Federal Power Act; (3) Any compliance order issued under section 31(a) of the Federal Power Act; or (4) Any requirement of Part I of the Federal Power Act. (b) Only actions occurring on or after October 16, 1986, may subject a person to civil penalties.

official document · source cfr-2024

Actions subsequent to loan approval.

CFR · 2024-01-01 · US · Title 7

After the loan is approved, actions to be taken will be in accordance with 7 CFR part 3560, subpart B.

official document · source cfr-2024

Actions subsequent to loan closing.

CFR · 2024-01-01 · US · Title 7

(a) (b) (c) (d) (e) (f) (1) The complete docket; and (2) A statement covering information other than the completion of legal documents showing what was done in carrying out loan closing instructions. (g) (h) (i)

official document · source cfr-2024

Actions subsequent to release from competitive level.

CFR · 2024-01-01 · US · Title 5

An employee reached for release from a competitive level shall be offered assignment to another position in accordance with subpart G of this part. If the employee accepts, the employee shall be assigned to the position offered. If the employee has no assignment right or does not accept an offer under subpart G, the employee shall be furloughed or separated.

official document · source cfr-2024

Actions taken under delegated authority.

CFR · 2024-01-01 · US · Title 47

In discharging the authority conferred by § 0.271, the Chief, Office of Economics and Analytics, shall establish working relationships with other Bureaus and staff Offices to assure the effective coordination of actions taken in the analysis of regulatory impacts, including assessments of paperwork burdens and initial and final regulatory flexibility assessments.

official document · source cfr-2024

Actions taken under delegated authority.

CFR · 2024-01-01 · US · Title 47

(a) In discharging the authority conferred by § 0.283 of this part, the Chief, Media Bureau, shall establish working relationships with other bureaus and staff offices to assure the effective coordination of actions taken in the following areas of joint responsibility; (1) Complaints arising under section 315 of the Communications Act—Office of General Counsel. (2) Requests for waiver of tower painting and lighting specifications-Wireless Telecommunications Bureau. (3) Requests for use of frequencies or bands of frequencies shared with private sector nonbroadcast or government services—Office of Engineering and Technology and appropriate operating bureau. (4) Requests involving coordination with other agencies of government—Office of General Counsel, Office of Engineering and Technology and appropriate operating bureau. (5) Proposals involving possible harmful impact on radio astronomy or radio research installations—Office of Engineering and Technology. (b) With respect to non-routine applications granted under authority delegated in § 0.283 of this part, the Chief, Media Bureau or his designees, shall enter on the working papers associated with each application a narrative justification of the action taken. While not available for public inspection, these working papers shall, upon request, be made available to the Commissioners and members of their staffs.

official document · source cfr-2024

Actions taken under delegated authority.

CFR · 2024-01-01 · US · Title 47

In discharging the authority conferred by § 0.331, the Chief, Wireless Telecommunications Bureau, shall establish working relationships with other bureaus and staff offices to assure the effective coordination of actions taken in the following areas of joint responsibility: (a) [Reserved] (b) Requests for waiver of tower painting and lighting specifications—Enforcement Bureau. (c) Matters involving public safety, homeland security, national security, emergency management and preparedness, and disaster management communications—the Public Safety and Homeland Security Bureau. (d) Complaints involving equal employment opportunities—Office of General Counsel. (e) Requests for use of frequencies or bands of frequencies shared with broadcast, common carrier, or government services—Office of Engineering and Technology and appropriate operating bureau. (f) Requests involving coordination with other Federal or state agencies when appropriate—Office of General Counsel, Office of Engineering and Technology or operating bureau. (g) Proposals involving possible harmful impact on radio astronomy or radio research installations—Office of Engineering and Technology.

official document · source cfr-2024

Actions that an applicant must take when training is required.

CFR · 2024-01-01 · US · Title 7

(a) (2) The Agency will grant a one-year extension to complete training if the applicant is unable to complete training within the 2-year period due to circumstances beyond the applicant's control. (3) The Agency will grant an extension longer than one year for extraordinary circumstances as determined by the Agency. (4) An applicant who does not complete the required training within the specified time-period will be ineligible for additional direct FLP loans until the training is completed. (b) (c) (2) The payment of training fees is an authorized use of OL funds. (3) The Agency is not a party to fee or other agreements between the applicant and the vendor. (d)

official document · source cfr-2024

Actions that are initial determinations.

CFR · 2024-01-01 · US · Title 42

(a) (1) A determination with respect to entitlement to hospital insurance or supplementary medical insurance under Medicare. (2) A disallowance of an individual's application for entitlement to hospital or supplementary medical insurance, if the individual fails to submit evidence requested by SSA to support the application. (SSA specifies in the initial determination the conditions of entitlement that the applicant failed to establish by not submitting the requested evidence). (3) A denial of a request for withdrawal of an application for hospital or supplementary medical insurance, or a denial of a request for cancellation of a request for withdrawal. (4) A determination as to whether an individual, previously determined as entitled to hospital or supplementary medical insurance, is no longer entitled to those benefits, including a determination based on nonpayment of premiums. (5) An adjustment of premium for hospital or supplementary medical insurance as outlined in §§ 406.32(d), 408.20(e), and 408.22 of this chapter, and 20 CFR 418.1301. (b) (1) If the items and/or services furnished are covered under title XVIII. (2) In the case of determinations on the basis of section 1879(b) or (c) of the Act, if the beneficiary, or supplier who accepts assignment under § 424.55 of this chapter knew, or could reasonably have expected to know at the time the items or services were furnished, that the items or services were not covered. (3) In the case of determinations on the basis of

official document · source cfr-2024

Actions that are not initial determinations.

CFR · 2024-01-01 · US · Title 42

Actions that are not initial determinations and are not appealable under this subpart include, but are not limited to the following: (a) Any determination for which CMS has sole responsibility, for example one of the following: (1) If an entity meets the conditions for participation in the program. (2) If an independent laboratory meets the conditions for coverage of services. (3) Determination under the Medicare Secondary Payer provisions of section 1862(b) of the Act of the debtor for a particular recovery claim. (b) The coinsurance amounts prescribed by regulation for outpatient services under the prospective payment system. (c) Any issue regarding the computation of the payment amount of program reimbursement of general applicability for which CMS or a carrier has sole responsibility under Part B such as the establishment of a fee schedule set forth in part 414 of this chapter, or an inherent reasonableness adjustment pursuant to § 405.502(g), and any issue regarding the cost report settlement process under Part A. (d) Whether an individual's appeal meets the qualifications for expedited access to judicial review provided in § 405.990. (e) Any determination regarding whether a Medicare overpayment claim must be compromised, or collection action terminated or suspended under the Federal Claims Collection Act of 1966, as amended. (f) Determinations regarding the transfer or discharge of residents of skilled nursing facilities in accordance with § 483.5 definition of `transf

official document · source cfr-2024

Actions that do not require an EA or EIS.

CFR · 2024-01-01 · US · Title 36

(a) (1) Personnel actions and investigations and personal services contracts; (2) Administrative actions and operations directly related to the operation of the Trust (e.g., purchase of furnishings, services, and equipment) provided such actions and operations are consistent with applicable Executive Orders; (3) Internal organizational changes and facility and office expansions, reductions, and closings; (4) Routine financial transactions, including such things as salaries and expenses, procurement, guarantees, financial assistance, income transfers, audits, fees, bonds and royalties; (5) Management, formulation, allocation, transfer and reprogramming of the Trust's budget; (6) Routine and continuing government business, including such things as supervision, administration, operations, maintenance, and replacement activities having limited context and intensity (limited size and magnitude or short-term effects); (7) Preparation, issuance, and submittal of publications and routine reports; (8) Activities which are educational, informational, or advisory (including interpretive programs), or otherwise in consultation with or providing technical assistance to other agencies, public and private entities, visitors, individuals, or the general public; (9) Legislative proposals of an administrative or technical nature, including such things as changes in authorizations for appropriations or financing authority, minor boundary changes and land transactions; or having primarily econom

official document · source cfr-2024

Actions that may have a significant environmental effect, for which Environmental Assessments (EAs) must be prepared.

CFR · 2024-01-01 · US · Title 47

(a) Commission actions with respect to the following types of facilities may significantly affect the environment and thus require the preparation of EAs by the applicant (see §§ 1.1308 and 1.1311) and may require further Commission environmental processing ( (1) Facilities that are to be located in an officially designated wilderness area. (2) Facilities that are to be located in an officially designated wildlife preserve. (3) Facilities that: (i) May affect listed threatened or endangered species or designated critical habitats; or (ii) are likely to jeopardize the continued existence of any proposed endangered or threatened species or likely to result in the destruction or adverse modification of proposed critical habitats, as determined by the Secretary of the Interior pursuant to the Endangered Species Act of 1973. (4) Facilities that may affect districts, sites, buildings, structures or objects, significant in American history, architecture, archeology, engineering or culture, that are listed, or are eligible for listing, in the National Register of Historic Places ( (5) Facilities that may affect Indian religious sites. (6) Facilities to be located in floodplains, if the facilities will not be placed at least one foot above the base flood elevation of the floodplain. (7) Facilities whose construction will involve significant change in surface features (e.g., wetland fill, deforestation or water diversion). (In the case of wetlands on Federal property, (8) Antenna tower

official document · source cfr-2024

Actions that normally require an EA.

CFR · 2024-01-01 · US · Title 36

(a) (b) (1) Potential for degradation of environmental quality; (2) Potential for cumulative adverse impact on environmental quality; and (3) Potential for adverse impact on protected resources (e.g., natural, scenic, recreational, historical, and cultural resources). (c) (1) Promulgation of regulations and requirements that are not categorically excluded; (2) Proposals submitted by project applicants to the Trust for its review, as described in § 1010.14; (3) Proposals to add or alter access between the Presidio Trust Area and surrounding neighborhoods; and (4) Contracts, work authorizations, and master agreements related to and implementing programs, policies, and proposals which are not categorically excluded and for which there is no previously prepared EA and/or EIS.

official document · source cfr-2024

Actions that normally require an EIS.

CFR · 2024-01-01 · US · Title 12

(a) If necessary, the Fund shall perform or have performed an environmental assessment to determine if an Application, or any portion of an Application, requires an EIS. However, it may be readily apparent that a proposed action in an Application will have a significant impact on the environment; in such cases, an environmental assessment is not required and the Fund shall immediately begin to prepare, or have prepared, an EIS. (b) An EIS normally is required where an Application proposes to directly use financial assistance from the Fund for any Project that would: (1) Remove, demolish, convert, or substantially rehabilitate 2,500 or more existing housing units, or would result in the construction or installation of 2,500 or more new housing units, or which would provide sites for 2,500 or more new housing units; or (2) Remove, demolish, convert, or substantially rehabilitate 1,500,000 square feet or more of commercial space, or would result in the construction or installation of 1,500,000 square feet or more of new commercial space, or which would provide sites for 1,500,000 square feet or more of new commercial space.

official document · source cfr-2024

Actions that normally require an EIS.

CFR · 2024-01-01 · US · Title 36

PADC shall perform or have performed an environmental assessment to determine if a proposal requires an environmental impact statement. However, it may be readily apparent that a proposed action will have a significant impact on the environment; in such cases, an environmental assessment is not required and PADC will immediately begin to prepare or have prepared the environmental impact statement. To assist in determining if a proposal or action normally requires the preparation of an environmental impact statement, the following criteria and categories of action are provided. (a) (1) Buildings or facades designated for retention in the Plan will be adversely affected by the proposal or action. (2) Traffic generated by the proposal or action would represent a substantial increase over the traffic projections assessed in the Final EIS in the average daily traffic volume on avenues and streets within the Development Area or its environs; (3) Air quality in the Development Area and its environs would be substantially affected by the proposal or action based upon the District of Columbia's adopted standard for hydrocarbons and carbon monoxide; (4) Solid waste disposal generated by a project of the Corporation or of a developer who is constructing, reconstructing, or rehabilitating that project, would have an adverse effect on the capacity of the relevant solid waste disposal facility and compliance with “Solid Waste Management Guidelines” of the U.S. Environmental Protection Agen

official document · source cfr-2024

Actions that normally require an EIS.

CFR · 2024-01-01 · US · Title 36

(a) (b) (c) (1) Legislative proposals made by the Trust to the United States Congress, other than those described in § 1010.7(b)(9); (2) Approval, funding, construction, and/or demolition in preparation for construction of any new building, if that activity has a significant effect on the human environment; (3) Proposals that would significantly alter the kind and amount of natural, recreational, historical, scenic, or cultural resources of the Presidio Trust Area or the integrity of the setting; and (4) Approval or amendment of a general land use or resource management plan for the entire Presidio Trust Area.

official document · source cfr-2024

Actions that normally require an environmental assessment.

CFR · 2024-01-01 · US · Title 36

If a proposal or action is not one that normally requires an environmental impact statement, and does not qualify for categorical exclusion, PADC will prepare or have prepared an environmental assessment. (a) (1) Potential for minor degradation of environmental quality; (2) Potential for cumulative impact on environmental quality; and (3) Potential for impact on protected resources. (b) (1) Amendments to the Plan that do not constitute a “substantial change” to the Plan. (2) Regulations promulgated by the Corporation that have significant environmental impact on the public or persons residing in the development area including businesses. (3) Development proposals submitted to the Corporation by private developers that are consistent with the Plan and General Guidelines prepared by the Corporation. (4) Activities related to the Public Improvements Program of the Corporation for which no previous environmental assessment or EIS has been prepared. (5) Contracts, work authorizations, and master agreements related to and implementing programs, policies, and proposals not categorically excluded and for which no environmental assessments or for which no environmental assessment and EIS have been previously prepared. (6) Street closures and other rearrangements of public space which were not covered in the Plan or the Final EIS. (7) Acquisition/disposal of personal property by the Corporation not related to any specific decision, plan, or program adopted by the Board of Directors of

official document · source cfr-2024

Actions that normally require the preparation of an environmental assessment.

CFR · 2024-01-01 · US · Title 28

(a) (b)

official document · source cfr-2024

Actions that normally require the preparation of an environmental impact statement.

CFR · 2024-01-01 · US · Title 28

The publisher provides no abstract for this document; none is invented here.

official document · source cfr-2024

Actions that require an environmental assessment.

CFR · 2024-01-01 · US · Title 12

If a Project or action is not one that normally requires an EIS and does not qualify for categorical exclusion, the Fund shall prepare, or have prepared, an environmental assessment.

official document · source cfr-2024

Actions that require an environmental assessment.

CFR · 2024-01-01 · US · Title 18

(a) An environmental assessment will normally be prepared first for the actions identified in this section. Depending on the outcome of the environmental assessment, the Commission may or may not prepare an environmental impact statement. However, depending on the location or scope of the proposed action, or the resources affected, the Commission may in specific circumstances proceed directly to prepare an environmental impact statement. (b) The projects subject to an environmental assessment are as follows: (1) Except as identified in §§ 380.4, 380.6 and 2.55 of this chapter, authorization for the site of new gas import/export facilities under DOE Delegation No. 0204-112 and authorization under section 7 of the Natural Gas Act for the construction, replacement, or abandonment of compression, processing, or interconnecting facilities, onshore and offshore pipelines, metering facilities, LNG peak-shaving facilities, or other facilities necessary for the sale, exchange, storage, or transportation of natural gas; (2) Prior notice filings under § 157.208 of this chapter for the rearrangement of any facility specified in §§ 157.202 (b)(3) and (6) of this chapter or the acquisition, construction, or operation of any eligible facility as specified in §§ 157.202 (b)(2) and (3) of this chapter; (3) Abandonment or reduction of natural gas service under section 7 of the Natural Gas Act unless excluded under § 380.4 (a)(21), (28) or (29); (4) Except as identified in § 380.6, conversion o

official document · source cfr-2024

Actions that require an environmental impact statement.

CFR · 2024-01-01 · US · Title 18

(a) Except as provided in paragraph (b) of this section, an environmental impact statement will normally be prepared first for the following projects: (1) Authorization under sections 3 or 7 of the Natural Gas Act and DOE Delegation Order No. 0204-112 for the siting, construction, and operation of jurisdictional liquefied natural gas import/export facilities used wholly or in part to liquefy, store, or regasify liquefied natural gas transported by water; (2) Certificate applications under section 7 of the Natural Gas Act to develop an underground natural gas storage facility except where depleted oil or natural gas producing fields are used; (3) Major pipeline construction projects under section 7 of the Natural Gas Act using rights-of-way in which there is no existing natural gas pipeline; (4) Licenses under Part I of the Federal Power Act and part 4 of this chapter for construction of any unconstructed water power projects; and (5) Major electric transmission facilities under section 216 of the Federal Power Act and DOE Delegation Order No. 00-004.00A using right-of-way in which there is no existing facility. (b) If the Commission believes that a proposed action identified in paragraph (a) of this section may not be a major Federal action significantly affecting the quality of the human environment, an environmental assessment, rather than an environmental impact statement, will be prepared first. Depending on the outcome of the environmental assessment, an environmental im

official document · source cfr-2024

Actions that will affect floodplains or wetlands.

CFR · 2024-01-01 · US · Title 18

(a) When a proposed action can otherwise be categorically excluded under § 1318.200, no additional floodplain or wetland evaluation is required if: (1) The initiating TVA entity determines that there is no practicable alternative that will avoid affecting floodplains or wetlands and that all practicable measures to minimize impacts of the proposed action to floodplains or wetlands are incorporated and (2) The TVA staff determines that impacts on the floodplain or wetland would be minor. (b) If the action requires an EA or an EIS, the evaluation must consider: (1) The effect of the proposed action on natural and beneficial floodplain and wetland values and (2) Alternatives to the proposed action that would eliminate or minimize such effects. (c) The initiating TVA entity must determine if there is no practicable alternative to siting in a floodplain or constructing in a wetland. Upon concurrence by the NEPA compliance staff in consultation with TVA legal counsel and TVA staff with expertise in floodplain or wetland impact evaluations, this determination shall be final. If a determination of no practicable alternative is made, all practicable measures to minimize impacts of the proposed action on the floodplain or wetland must be implemented. If at any time prior to commencement of the action it is determined that there is a practicable alternative that will avoid affecting floodplains or wetlands, the proposed action must not proceed.

official document · source cfr-2024

Actions to adjust or meet conditions unfavorable to shipping in specific trades.

CFR · 2024-01-01 · US · Title 46

Whenever the Commission determines that conditions unfavorable to shipping exist in the United States foreign trade with any nation and issues rules to adjust or meet such conditions, pursuant to section 19(1)(b) of the Merchant Marine Act, 1920 (46 U.S.C. 42101) and 46 CFR part 551, such rules shall be published in the

official document · source cfr-2024

Actions to be taken by lender.

CFR · 2024-01-01 · US · Title 24

With respect to any action required of the lender within a period of time prescribed by this subpart, the Commissioner may extend such period.

official document · source cfr-2024

Actions to be taken by lender.

CFR · 2024-01-01 · US · Title 24

With respect to any action required of the lender within a period of time prescribed by this subpart, the Commissioner may extend such period.

official document · source cfr-2024

Actions to be taken by mortgagee or lender.

CFR · 2024-01-01 · US · Title 24

With respect to any action required by the mortgagee or lender within a period of time prescribed by this subpart the Commissioner may extend such period.

official document · source cfr-2024

Actions to be taken by the applicant preliminary to discharge review.

CFR · 2024-01-01 · US · Title 32

(a) (b) The application is to be accompanied by: (1) A copy of the certificate of discharge, if available; (2) A copy of the Armed Forces of the United States Report of Transfer or Discharge (DD-214), if available; (3) Certification of death, incompetency and evidence of relationship in applicable cases (§ 724.113); (4) Other statements, affidavits, depositions, documents and information desired by the applicant to be considered by the NDRB. (c) Correspondence relating to review of naval discharges should be addressed to: (d) NDRB telephone number is (202) 685-6600.

official document · source cfr-2024

Actions to be taken to meet the goals.

CFR · 2024-01-01 · US · Title 24

To meet the goals under this rule, each GSE shall operate in accordance with 12 U.S.C. 4565.

official document · source cfr-2024

Actions to be taken when archeological properties are discovered during construction.

CFR · 2024-01-01 · US · Title 7

(a) When properties of significant HA value are discovered during construction, the State Director will immediately consult with the applicant, the SHPO and the Regional Director of the National Park Service to determine whether there is sufficient factual evidence to warrant a decision to stop construction and undertake detailed survey and recovery. (b) When the consultations in paragraph (a) of this section result in a determination by the National Park Service to request the applicant to stop construction, such stop action should be taken so that the Park Service can initiate measures for immediate recovery within 60 days after notification of a discovery. (c) When the consultations in paragraph (a) of this section do not result in a determination by the National Park Service to stop construction and to undertake a survey and recovery, construction should be permitted to proceed with caution. In the event that the National Park Service determines that recovery is necessary, the FmHA or its successor agency under Public Law 103-354 applicant/borrower and the Park Service should determine that the consent of all persons, associations, or public entities having legal interests in the property involved has been secured. Also, the applicant should be informed that the Secretary of the Interior is authorized to compensate any person, association, or public entity damaged as a result of delay in construction or as a result of the temporary loss of the use of public or any nonfede

official document · source cfr-2024