Legal · US
225,069 document(s) from the ingested source(s); showing
100.
page 42 of 2251 · 225,069 documents · previous next
Additional PLB and MSLD certification requirements.
CFR · 2024-01-01
· US
· Title 47
(a) To be certified for use under this subpart, 406 MHz PLB transmitter types must be designed to satisfy the following additional requirements. (1) (i) Certification from a test facility recognized by one of the COSPAS/SARSAT Partners that the PLB transmitter type satisfies the standards in RTCM 11010; and, (ii) Certification from an independent test facility that the PLB transmitter type complies with the electrical and environmental standards associated with RTCM 11010. (2) (b) To be certified for use under this subpart, MSLD transmitter types must be designed to satisfy the following additional requirements. (1) A test report from a test laboratory which shows that the MSLD complies with the electrical and environmental standards associated with RTCM 11901. The test laboratory must be accredited to ISO-IEC 17025 with a scope covering the applicable requirements and test procedures. (2) After the MSLD has been certified by a test laboratory, the following information must be submitted in duplicate to the U.S. Coast Guard, 2703 Martin Luther King Jr. Ave. SE., Stop 7126, Washington, DC 20593-7126: (i) The name of the manufacturer or grantee and model number of the MSLD; (ii) Copies of the test report and test data showing that the MSLD complies with the electrical and environmental standards associated with RTCM 11901; and (iii) Instruction manuals associated with the MSLD, description of the test characteristics of the MSLD including assembly drawings, electrical schematic
official document
· source cfr-2024
Additional REDL terms.
CFR · 2024-01-01
· US
· Title 7
(a) The Intermediary is responsible for fully repaying the Zero-Interest Loan to RBS even if the Ultimate Recipient does not repay the Intermediary. (b) The Intermediary is responsible for remitting any partial or full payment to RBS at the time the Ultimate Recipient pays the Intermediary. (c) Unless deferred pursuant to § 4280.16(b) of this subpart, loan payments to Rural Development under the REDL Program are due monthly. (d) If the Intermediary does not have an outstanding loan with RUS, the Intermediary must immediately provide, as security for any REDL loan it receives, a Rural Development-approved irrevocable letter of credit that remains in effect until the loan is repaid.
official document
· source cfr-2024
Additional Reports of Work—Research and Development.
CFR · 2024-01-01
· US
· Title 48
As prescribed in 1835.070(e), insert a clause substantially the same as the following:
official document
· source cfr-2024
Additional Requirements for Major Systems.
CFR · 2024-01-01
· US
· Title 48
The publisher provides no abstract for this document; none is invented here.
official document
· source cfr-2024
Additional Safety Measures.
CFR · 2024-01-01
· US
· Title 48
As prescribed in 636.513, insert the following clause. In addition to the safety/accident prevention requirements of FAR 52.236-13, Accident Prevention Alternate I, the contractor shall comply with the following additional safety measures. (a) (1) Scaffolding; (2) Work at heights above 1.8 meters; (3) Trenching or other excavation greater than one (1) meter in depth; (4) Earth-moving equipment and other large vehicles; (5) Cranes and rigging; (6) Welding or cutting and other hot work; (7) Partial or total demolition of a structure; (8) Temporary wiring, use of portable electric tools, or other recognized electrical hazards. Temporary wiring and portable electric tools require the use of a ground fault circuit interrupter (GFCI) in the affected circuits; other electrical hazards may also require the use of a GFCI; (9) Work in confined spaces (limited exits, potential for oxygen less than 19.5 percent or combustible atmosphere, potential for solid or liquid engulfment, or other hazards considered to be immediately dangerous to life or health such as water tanks, transformer vaults, sewers, cisterns, etc.); (10) Hazardous materials—a material with a physical or health hazard including but not limited to, flammable, explosive, corrosive, toxic, reactive or unstable, or any operations, which creates any kind of contamination inside an occupied building such as dust from demolition activities, paints, solvents, etc.; or (11) Hazardous noise levels as required in EM 385-1 Section 5B
official document
· source cfr-2024
Additional Schedule B disclosure and filing requirements.
CFR · 2024-01-01
· US
· Title 17
(a) The copy of the opinion or opinions of counsel required by paragraph (14) of Schedule B shall be filed either as a part of the registration statement as originally filed, or as an amendment to the registration statement. (b) A foreign government or political subdivision of a foreign government must file a registration statement submitted under Schedule B of the Act on the Commission's Electronic Data Gathering and Retrieval System (EDGAR) unless it has obtained a hardship exemption under § 232.201 or § 232.202 of this chapter (Regulation S-T). (c) A foreign government or political subdivision must disclose in its Schedule B registration statement: (1) That the Commission maintains an Internet site that contains reports and other information regarding issuers that file electronically with the Commission; and (2) The address for the Commission Internet site (
official document
· source cfr-2024
Additional VA solicitation provisions and contract clauses.
CFR · 2024-01-01
· US
· Title 48
For contracts, orders, or BPAs to be issued as SDVOSB/VOSB reserve, tiered evaluation, set-aside, or sole source, see 819.7011. Also see subparts 808.4 and 815.3 and 819.203-70 for requirements and clauses applicable to VA small business set-asides.
official document
· source cfr-2024
Additional absentee voter challenge period.
CFR · 2024-01-01
· US
· Title 7
(a) (b) (c) (d) (e) (f) (g) (h)
official document
· source cfr-2024
Additional acquisition flexibilities.
CFR · 2024-01-01
· US
· Title 48
Additional acquisition flexibilities available to DoD are as follows: (a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k)
official document
· source cfr-2024
Additional actions by CMS or the State.
CFR · 2024-01-01
· US
· Title 42
After consultation with the State administering agency, if CMS determines that the PACE organization is not in substantial compliance with requirements in this part, CMS or the State administering agency may take one or more of the following actions: (a) Condition the continuation of the PACE program agreement upon timely execution of a corrective action plan. (b) Withhold some or all payments under the PACE program agreement until the organization corrects the deficiency. (c) Terminate the PACE program agreement.
official document
· source cfr-2024
Additional activity regulations by Sanctuary area.
CFR · 2024-01-01
· US
· Title 15
In addition to the prohibitions set forth in § 922.163, which apply throughout the Sanctuary, the following regulations apply with respect to activities conducted within the Sanctuary areas described in this section and in Appendix (II) through (VII) to this subpart. Activities located within two or more overlapping Sanctuary areas are concurrently subject to the regulations applicable to each overlapping area. (a) (b) (i) Removing, taking, damaging, harmfully disturbing, breaking, cutting, spearing or similarly injuring any coral or other marine invertebrate, or any plant, soil, rock, or other material, except commercial taking of spiny lobster and stone crab by trap and recreational taking of spiny lobster by hand or by hand gear which is consistent with these regulations and the applicable regulations implementing the applicable Fishery Management Plan. (ii) Taking any tropical fish. (iii) Fishing with wire fish traps, bottom trawls, dredges, fish sleds, or similar vessel-towed or anchored bottom fishing gear or nets. (iv) Fishing with, carrying or possessing, except while passing through without interruption or for law enforcement purposes: pole spears, air rifles, bows and arrows, slings, Hawaiian slings, rubber powered arbaletes, pneumatic and spring-loaded guns or similar devices known as spearguns. (2) (c) (2) The following activities are prohibited within the marine portions of the Wildlife Management Areas listed in appendix III to this subpart: (i) In those marine
official document
· source cfr-2024
Additional administrative collection action.
CFR · 2024-01-01
· US
· Title 5
Nothing contained in this subpart is intended to preclude the use of any other administrative remedy which may be appropriate.
official document
· source cfr-2024
Additional administrative collection action.
CFR · 2024-01-01
· US
· Title 29
Nothing contained in this subpart is intended to preclude the utilization of any other administrative remedy which may be available.
official document
· source cfr-2024
Additional administrative collection action.
CFR · 2024-01-01
· US
· Title 29
Nothing contained in this subpart is intended to preclude the utilization of any other administrative remedy which may be available.
official document
· source cfr-2024
Additional administrative collection action.
CFR · 2024-01-01
· US
· Title 29
Nothing contained in this subpart is intended to preclude the Agency from utilizing any other administrative or legal remedy which may be available.
official document
· source cfr-2024
Additional administrative collection action.
CFR · 2024-01-01
· US
· Title 45
Nothing contained in this part is intended to preclude the use of any other appropriate administrative remedy.
official document
· source cfr-2024
Additional administrative collection action.
CFR · 2024-01-01
· US
· Title 49
Nothing contained in this part is intended to preclude any other administrative remedy which may be available.
official document
· source cfr-2024
Additional administrative procedures.
CFR · 2024-01-01
· US
· Title 5
Nothing contained in this chapter is intended to preclude the use of any other administrative remedy which may be available.
official document
· source cfr-2024
Additional agency requirements.
CFR · 2024-01-01
· US
· Title 5
After OPM approves an agency plan for Voluntary Separation Incentive Payments, the agency must immediately notify OPM of any subsequent changes in the conditions that served as the basis for the approval of the Voluntary Separation Incentive Payment authority.
official document
· source cfr-2024
Additional agreements.
CFR · 2024-01-01
· US
· Title 45
(a) With respect to individuals seeking treatment services, the State is required to improve (relative to fiscal year 1992) the process in the State for referring the individuals to treatment facilities that can provide to the individuals the treatment modality that is most appropriate for the individuals. Examples of how this may be accomplished include the development and implementation of a capacity management/waiting list management system; the utilization of a toll-free number for programs to report available capacity and waiting list data; and the utilization of standardized assessment procedures that facilitate the referral process. (b) With respect to any facility for treatment services or prevention activities that is receiving amounts from a Block Grant, continuing education in such services or activities (or both, as the case may be) shall be made available to employees of the facility who provide the services or activities. The States will ensure that such programs include a provision for continuing education for employees of the facility in its funding agreement. (c) The State shall coordinate prevention and treatment activities with the provision of other appropriate services (including health, social, correctional and criminal justice, educational, vocational rehabilitation, and (d) Upon the request of a State, the Secretary may provide to a State a waiver of any or all of the requirements established in paragraphs (a), (b) and (c) of this section, if the Secre
official document
· source cfr-2024
Additional aircraft category and class ratings.
CFR · 2024-01-01
· US
· Title 14
(a) (1) Meet the eligibility requirements of § 61.153 of this part; (2) Pass a knowledge test on the aeronautical knowledge areas of § 61.155(c) of this part; (3) Comply with the requirements in § 61.157(b) of this part, if appropriate; (4) Meet the applicable aeronautical experience requirements of § 61.161 of this part; and (5) Pass the practical test on the areas of operation of § 61.157(e)(4) of this part. (b) (1) Meet the eligibility requirements of § 61.153 of this part; (2) Pass a knowledge test on the aeronautical knowledge areas of § 61.155(c) of this part; (3) Comply with the requirements in § 61.157(b) of this part, if appropriate; (4) Meet the applicable aeronautical experience requirements of § 61.159 of this part; and (5) Pass the practical test on the areas of operation of § 61.157(e)(1) of this part. (c) (1) Meet the eligibility requirements of § 61.153 of this part; (2) Successfully complete the airline transport pilot certification training program specified in § 61.156; (3) Pass a knowledge test for an airplane category multiengine class rating or type rating on the aeronautical knowledge areas of § 61.155(c); (4) Comply with the requirements in § 61.157(b) of this part, if appropriate; (5) Meet the aeronautical experience requirements of § 61.159 or § 61.160; and (6) Pass the practical test on the areas of operation of § 61.157(e)(2) of this part. (d) (1) Meet the eligibility requirements of § 61.153 of this part; (2) Pass a required knowledge test on the
official document
· source cfr-2024
Additional aircraft ratings (other than for ratings at the airline transport pilot certification level).
CFR · 2024-01-01
· US
· Title 14
(a) (b) (1) Must complete the training and have the applicable aeronautical experience. (2) Must have a logbook or training record endorsement from an authorized instructor attesting that the person was found competent in the appropriate aeronautical knowledge areas and proficient in the appropriate areas of operation. (3) Must pass the practical test. (4) Need not take an additional knowledge test, provided the applicant holds an airplane, rotorcraft, powered-lift, weight-shift-control aircraft, powered parachute, or airship rating at that pilot certificate level. (c) (1) Must have a logbook or training record endorsement from an authorized instructor attesting that the person was found competent in the appropriate aeronautical knowledge areas and proficient in the appropriate areas of operation. (2) Must pass the practical test. (3) Need not meet the specified training time requirements prescribed by (4) Need not take an additional knowledge test, provided the applicant holds an airplane, rotorcraft, powered-lift, weight-shift-control aircraft, powered parachute, or airship rating at that pilot certificate level. (d) (1) Must hold or concurrently obtain an appropriate instrument rating, except as provided in paragraph (e) of this section. (2) Must have a logbook or training record endorsement from an authorized instructor attesting that the person is competent in the appropriate aeronautical knowledge areas and proficient in the appropriate areas of operation at the airline
official document
· source cfr-2024
Additional airworthiness requirements.
CFR · 2024-01-01
· US
· Title 14
(a) Except for commuter category airplanes, no person may operate a large airplane unless it meets the additional airworthiness requirements of §§ 121.213 through 121.283 and 121.307 of this chapter. (b) No person may operate a small airplane that has a passenger-seating configuration, excluding pilot seats, of 10 seats or more unless it is type certificated— (1) In the transport category; (2) Before July 1, 1970, in the normal category and meets special conditions issued by the Administrator for airplanes intended for use in operations under this part; (3) Before July 19, 1970, in the normal category and meets the additional airworthiness standards in Special Federal Aviation Regulation No. 23; (4) In the normal category and meets the additional airworthiness standards in appendix A; (5) In the normal category and complies with section 1.(a) of Special Federal Aviation Regulation No. 41; (6) In the normal category and complies with section 1.(b) of Special Federal Aviation Regulation No. 41; (7) In the commuter category; or (8) In the normal category, as a multi-engine certification level 4 airplane as defined in part 23 of this chapter. (c) No person may operate a small airplane with a passenger seating configuration, excluding any pilot seat, of 10 seats or more, with a seating configuration greater than the maximum seating configuration used in that type airplane in operations under this part before August 19, 1977. This paragraph does not apply to— (1) An airplane that i
official document
· source cfr-2024
Additional appeal rights under Medicare or Medicaid.
CFR · 2024-01-01
· US
· Title 42
A PACE organization must inform a participant in writing of his or her appeal rights under Medicare or Medicaid managed care, or both, assist the participant in choosing which to pursue if both are applicable, and forward the appeal to the appropriate external entity. (a) (1) A written request for reconsideration must be filed with the independent review entity within 60 calendar days from the date of the decision by the third party reviewer under § 460.122. (2) The independent outside entity must conduct the review as expeditiously as the participant's health condition requires but must not exceed the deadlines specified in the contract. (3) If the independent review entity conducts a reconsideration, the parties to the reconsideration are the same parties described in § 460.122(c)(2), with the addition of the PACE organization. (b) (c)
official document
· source cfr-2024
Additional applicable Chapter 31 regulations.
CFR · 2024-01-01
· US
· Title 38
The following regulations are applicable to veterans pursuing the vocational training under this program in the same manner as they apply to 38 U.S.C. chapter 31: § 21.380, § 21.390, § 21.400, § 21.402, § 21.412, § 21.414 (except (d) and (e)), § 21.420, and § 21.430 (except (a)) of this part.
official document
· source cfr-2024
Additional applicable regulations.
CFR · 2024-01-01
· US
· Title 38
The following regulations are applicable to children in this program in a manner comparable to that provided for veterans under the 38 U.S.C. chapter 31 program: §§ 21.380, 21.412, 21.414 (except (c), (d), and (e)), 21.420, and 21.430.
official document
· source cfr-2024
Additional application provider requirements.
CFR · 2024-01-01
· US
· Title 21
(a) If an application provider identifies or is made aware of any issue with its application that make the application non-compliant with the requirements of this part, the application provider must notify practitioners or pharmacies that use the application as soon as feasible, but no later than five business days after discovery, that the application should not be used to issue or process electronic controlled substance prescriptions. (b) When providing practitioners or pharmacies with updates to any issue that makes the application non-compliant with the requirements of this part, the application provider must indicate that the updates must be installed before the practitioner or pharmacy may use the application to issue or process electronic controlled substance prescriptions.
official document
· source cfr-2024
Additional application requirements.
CFR · 2024-01-01
· US
· Title 38
For a project to be eligible for a grant under this part for the fiscal year for which the priority list was made, during that fiscal year the State must submit to VA an original and a copy of the following: (a) Complete, updated Standard Forms 424 (mark the box labeled application and submit the information requested for an application), 424C, and 424D (these forms are available on the internet Web site provided in § 59.170 of this part), and (b) A completed VA Form 10-0388-5 and all information and documentation specified by VA Form 10-0388-5 (this form is available on the internet Web site provided in § 59.170).
official document
· source cfr-2024
Additional application submission requirements for Pockets of Poverty—employment opportunities.
CFR · 2024-01-01
· US
· Title 24
Applicants for Action Grants under the Pockets of Poverty provision must describe the number and, to the extent possible, the types of new jobs (construction and permanent) that will be provided to the low- and moderate-income residents of the Pocket of Poverty as a direct result of the proposed project. If the application calls for job training programs (such as those related to the CETA program) or job recruiting services for the pocket's residents, then such proposed activities must be clearly and fully explained. HUD requires applicants to ensure that at least 75 percent of whatever permanent jobs initially result from the project are provided to low- and moderate-income persons and that at least 51 percent of whatever permanent jobs initially result from the project are provided to low- and moderate-income residents from the pocket. HUD encourages applicants to ensure that at least 20 percent of all permanent jobs are filled by persons from the pocket qualified to participate in the CETA program on a continuous basis. HUD requires all applicants to continuously use best efforts to ensure that at least 75 percent of all permanent jobs resulting from any Action Grant-assisted project are provided to low- and moderate-income persons and that at least 51 percent of all permanent jobs resulting from any Action Grant-assisted project are provided to low- and moderate-income residents from the pocket. The application should clearly describe how the applicant intends to meet ini
official document
· source cfr-2024
Additional approval criteria for accidental release prevention programs.
CFR · 2024-01-01
· US
· Title 40
(a) A State submission for approval of a part 68 program must meet the criteria and be in accordance with the procedures of this section, § 63.91, and, where appropriate, either § 63.92 or § 63.93. (b) The State part 68 program application shall contain the following elements consistent with the procedures in § 63.91 and, where appropriate, either § 63.92 or § 63.93 of this subpart, for at least the chemicals listed in part 68 subpart F (“federally-listed chemicals”) that an approvable State Accidental Release Prevention program is regulating: (1)(i) A demonstration of the State's authority and resources to implement and enforce regulations that are no less stringent than the regulations of part 68, subparts A through G and § 68.200 of this chapter; and (ii) A requirement that any source subject to the State's part 68 program submit a Risk Management Plan (RMP) that reports at least the same information in the same format as required under part 68, subpart G of this chapter. (2) A State's RMP program may require reporting of information not required by the Federal program, and these requirements (like any other additional State requirements) will become federally enforceable upon approval. The extent to which EPA will be able to help a State collect and report additional information through EPA's electronic RMP submission system will be determined on a case-by-case basis. (3) Procedures for reviewing risk management plans and providing technical assistance to stationary sourc
official document
· source cfr-2024
Additional approval tests for SOLAS A and SOLAS B inflatable liferafts.
CFR · 2024-01-01
· US
· Title 46
To verify compliance with the requirements of IMO LSA Code, as amended by Resolution MSC.293(87), Chapter IV/4.3.5 (incorporated by reference, see § 160.151-5 of this subpart), the following test must be conducted for SOLAS A and SOLAS B inflatable liferafts in addition to those required by § 160.151-27 and IMO Revised recommendation on testing, as amended by Resolution MSC.295(87) (incorporated by reference, see § 160.151-5 of this subpart: (a) (1) The appendage must be attached to a testing jig similar in material and construction to the appendage's intended location on a liferaft. The method of attachment must be the same as used on a liferaft. The appendage and jig must be attached to a scale capable of recording peak readings, and suspended over a pool of calm water. The dry weight must be recorded. (2) The appendage and jig must then be quickly lowered into the water until the appendage is completely submerged. When the appendage has been in the water for 25 seconds, it must be smoothly lifted completely out of the water, and the peak weight after the appendage is removed from the water recorded. (3) The difference in weights measured according to paragraphs (a) (1) and (2) of this section must be at least 60 percent of the appendage's volume, calculated in accordance with § 160.151-17(a)(2)(i). (b) [Reserved]
official document
· source cfr-2024
Additional assistance capability requirements for wireline, cellular, and PCS telecommunications carriers.
CFR · 2024-01-01
· US
· Title 47
(a) (2) (3) (4) (5) Dialed digit extraction. Capability that permits a LEA to receive on the call data channel digits dialed by a subject after a call is connected to another carrier's service for processing and routing. (6) (7) (8) (9) (10) (11) (12) (13) (14) (b) In addition to the requirements in § 1.20006, wireline, cellular, and PCS telecommunications carriers shall provide to a LEA the assistance capability requirements regarding wire and electronic communications and call identifying information covered by J-STD-025 (current version), and, subject to the definitions in this section, may satisfy these requirements by complying with J-STD-025 (current version), or by another means of their own choosing. These carriers also shall provide to a LEA the following capabilities: (1) Content of subject-initiated conference calls; (2) Party hold, join, drop on conference calls; (3) Subject-initiated dialing and signaling information; (4) In-band and out-of-band signaling; (5) Timing information; (6) Dialed digit extraction, with a toggle feature that can activate/deactivate this capability.
official document
· source cfr-2024
Additional audits.
CFR · 2024-01-01
· US
· Title 11
In accordance with 11 CFR 104.16(c), the Commission, pursuant to 11 CFR 111.10, may upon affirmative vote of four members conduct an audit and field investigation of any committee in any case in which the Commission finds reason to believe that a violation of a statute or regulation over which the Commission has jurisdiction has occurred or is about to occur.
official document
· source cfr-2024
Additional audits.
CFR · 2024-01-01
· US
· Title 11
In accordance with 11 CFR 104.16(c), the Commission, pursuant to 11 CFR 111.10, may upon affirmative vote of four members conduct an audit and field investigation of any committee in any case in which the Commission finds reason to believe that a violation of a statute or regulation over which the Commission has jurisdiction has occurred or is about to occur.
official document
· source cfr-2024
Additional authority delegated.
CFR · 2024-01-01
· US
· Title 47
The Regional Directors are delegated authority to act upon applications, requests, or other matters, which are not in hearing status, and direct the following activities necessary to conduct investigations or inspections: (a) On informal requests from broadcast stations to extend temporary authority for operation without monitors, plate ammeter, plate volmeter, base current meter, common point meter, and transmission line meter from FM and television stations. (b) To act on and make determinations on behalf of the Commission regarding requests for assignments and reassignments of priorities under the Telecommunications Service Priority System, part 64 of the rules, when circumstances require immediate action and the common carrier seeking to provide service states that it cannot contact the National Communications System or the Commission office normally responsible for such assignments. To the extent possible, all such actions and determinations shall be made in coordination with the Public Safety and Homeland Security Bureau. (c) Require special equipment and program tests during inspections or investigations to determine compliance with technical requirements specified by the Commission. (d) Require stations to operate with the pre-sunrise and nighttime facilities during daytime hours in order that an inspection or investigation may be made by an authorized Commission representative to determine operating parameters. (e) Issue notices and orders to operators of industrial,
official document
· source cfr-2024
Additional authority of OPM.
CFR · 2024-01-01
· US
· Title 5
In addition to authorizing the recruitment and appointment of persons to overseas positions under regulations issued under the preceding Rules, OPM may, by the regulations prescribed by it, authorize the recruitment and appointment of persons to such positions as provided in § 8.2. As used in this part,
official document
· source cfr-2024
Additional benefits requirement.
CFR · 2024-01-01
· US
· Title 42
(a) (2) The dollar value of the elected option must, over the course of a contract period, be at least equal to the difference between the APCRP and the proposed ACR. (b) (2) (3) (4) (c) (2) The HMO or CMP may elect to provide additional benefits in any of the following forms— (i) A reduction in the HMO's or CMP's premium or in other charges it imposes in the form of deductibles or coinsurance. (ii) Health benefits in addition to the required Part A and Part B covered services. (iii) A combination of reduced charges and additional benefits. (d) (2) An HMO or CMP that elects the option of providing additional benefits must include in its submittal— (i) A description of the additional benefits it will provide to its Medicare enrollees; and (ii) Supporting evidence to show that the selected benefits meet the requirements of paragraph (a)(2) of this section with respect to dollar value equivalence.
official document
· source cfr-2024
Additional blood product listing information.
CFR · 2024-01-01
· US
· Title 21
(a) In addition to the information routinely required by §§ 607.25 and 607.30, the Director of the Center for Biologics Evaluation and Research may require submission of the following information by letter or by (1) For a particular blood product so listed, upon request made by the Director of the Center for Biologics Evaluation and Research for good cause, a copy of all advertisements. (2) For a particular blood product so listed, upon a finding by the Director of the Center for Biologics Evaluation and Research that it is necessary to carry out the purposes of the act, a quantitative listing of all ingredients. (3) For each registrant, upon a finding by the Director of the Center for Biologics Evaluation and Research that it is necessary to carry out the purposes of the act, a list of each listed (b) [Reserved]
official document
· source cfr-2024
Additional bond and security.
CFR · 2024-01-01
· US
· Title 48
(a) When additional bond coverage is required and is secured in whole or in part by the original surety or sureties, agencies shall use Standard Form 1415, Consent of Surety and Increase of Penalty. Standard Form 1415 is authorized for local reproduction. (b) When additional bond coverage is required and is secured in whole or in part by a new surety or by one of the alternatives described in 28.204 in lieu of corporate or individual surety, agencies shall use Standard Form 25, Performance Bond; Standard Form 1418, Performance Bond for Other Than Construction Contracts; Standard Form 25-A, Payment Bond; or Standard Form 1416, Payment Bond for Other Than Construction Contracts.
official document
· source cfr-2024
Additional bonding.
CFR · 2024-01-01
· US
· Title 43
The authorized officer may increase the amount of any bond that is required under this subpart after determining that additional coverage is needed to ensure protection of the lands or resources.
official document
· source cfr-2024
Additional bonds.
CFR · 2024-01-01
· US
· Title 43
(a) The authorized officer may require the bonded party to supply additional bonding in accordance with § 3104.5(b) of this chapter. (b) The holders of any oil and gas lease bond for a lease on the NPR-A shall be permitted to obtain a rider to include the coverage of oil and gas geophysical operations within the boundaries of NPR-A.
official document
· source cfr-2024
Additional briefs.
CFR · 2024-01-01
· US
· Title 20
Additional briefs may be filed or ordered in the discretion of the Board and shall be submitted within time limits specified by the Board.
official document
· source cfr-2024
Additional capital investments criteria.
CFR · 2024-01-01
· US
· Title 9
The Secretary may consider various criteria in determining whether a requirement that a poultry grower or swine production contract grower make additional capital investments over the life of a production contract or growing arrangement constitutes a violation of the Act. These criteria include, but are not limited to: (a) Whether a packer, swine contractor or live poultry dealer failed to give a poultry grower or swine production contract grower discretion to decide against the additional capital investment requirement; (b) Whether the additional capital investment is the result of coercion, retaliation or threats of coercion or retaliation by the packer, swine contractor or live poultry dealer; (c) Whether the packer, swine contractor or live poultry dealer intends or does substantially reduce or end operations at the slaughter plant or processing facility or intends or does substantially reduce or end production operations within 12 months of requiring the additional capital investment, absent the occurrence of a catastrophic or natural disaster, or other emergency, such as unforeseen bankruptcy; (d) Whether the packer, swine contractor, or live poultry dealer required some poultry growers or swine production contract growers to make additional capital investments, but did not require other similarly situated poultry growers or swine production contract growers to make the same additional capital investments; (e) The age and number of recent upgrades to, or capital investm
official document
· source cfr-2024
Additional causes for debarment.
CFR · 2024-01-01
· US
· Title 48
(a) (i) Any deliberate violation of the limitation on subcontracting clause requirements for acquisitions under subpart 819.70; or (ii) Failure to observe the material provisions of a voluntary exclusion or an administrative agreement. (2) The period of debarment shall be commensurate with the seriousness of the action. (b) (2) Debarment of a business concern pursuant to 38 U.S.C. 8127(g) shall include the debarment of all principals in the business concern. Debarment shall be for a period of not less than five years. (3) “Willful and intentional” misrepresentations, for the purpose of debarment actions taken pursuant to 38 U.S.C. 8127(g), are defined as deliberate misrepresentations concerning the status of the concern as a small business concern owned and controlled by Veterans or as a small business concern owned and controlled by service-disabled Veterans as supported by the preponderance of evidence. Examples of a preponderance of evidence for deliberate misrepresentation of SDVOSB and/or VOSB status include but are not limited to: Criminal convictions, plea agreements, deferred prosecution agreements, Board of Contract Appeals decisions, and admissions of guilt.
official document
· source cfr-2024
Additional certificate application requirements for commercial operators.
CFR · 2024-01-01
· US
· Title 14
(a) Each applicant for the original issue of an operating certificate for the purpose of conducting intrastate common carriage operations under part 121 or part 135 of this chapter must submit an application in a form and manner prescribed by the Administrator to the responsible Flight Standards office. (b) Each application submitted under paragraph (a) of this section must contain a signed statement showing the following: (1) For corporate applicants: (i) The name and address of each stockholder who owns 5 percent or more of the total voting stock of the corporation, and if that stockholder is not the sole beneficial owner of the stock, the name and address of each beneficial owner. An individual is considered to own the stock owned, directly or indirectly, by or for his or her spouse, children, grandchildren, or parents. (ii) The name and address of each director and each officer and each person employed or who will be employed in a management position described in §§ 119.65 and 119.69, as applicable. (iii) The name and address of each person directly or indirectly controlling or controlled by the applicant and each person under direct or indirect control with the applicant. (2) For non-corporate applicants: (i) The name and address of each person having a financial interest therein and the nature and extent of that interest. (ii) The name and address of each person employed or who will be employed in a management position described in §§ 119.65 and 119.69, as applicable. (
official document
· source cfr-2024
Additional certification procedures for a tank barge vapor collection system design—B/ALL.
CFR · 2024-01-01
· US
· Title 46
(a) For a tank barge vapor collection system intended for operation in multi-breasted loading using a single facility vapor connection, the tank barge owner or operator must submit plans, calculations, and specifications to the Marine Safety Center (MSC) for review and approval before beginning a multi-breasted loading operation. (b) For a tank barge intended for collecting vapors emitted from its cargo tanks during gas-freeing or cleaning operations at a cleaning facility, the barge owner or operator must submit the following items to the MSC for review and approval: (1) Stripping system plans and specifications, except those approved by the MSC on or before the August 15, 2013; and (2) Stripping and/or gas-freeing rate calculations, except those approved by (c) Once the vapor collection system satisfies the requirements of this part, the Officer in Charge, Marine Inspection (OCMI) will endorse the Certificate of Inspection that the tank barge is acceptable for collecting vapors during cleaning operations.
official document
· source cfr-2024
Additional certification testing requirements.
CFR · 2024-01-01
· US
· Title 10
Pursuant to § 429.102(b)(2), if DOE determines that independent, third-party testing is necessary to ensure a manufacturer's compliance with the rules of this part, part 430, or part 431, a manufacturer must base its certification of a basic model under subpart B of this part on independent, third-party laboratory testing.
official document
· source cfr-2024
Additional channel policies.
CFR · 2024-01-01
· US
· Title 47
The rules in this section govern the processing of applications for authority to operate a ground station transmitter on any ground station communication channel listed in § 22.805 when the applicant has applied or been (a) (b) (c) (d) (e) (f)
official document
· source cfr-2024
Additional channel policy for rural radiotelephone stations.
CFR · 2024-01-01
· US
· Title 47
The rules in this section govern the processing of applications for central office stations that request a rural radiotelephone channel pair when the applicant has applied for or been granted an authorization for other rural radiotelephone channel pairs in the same area. The general policy of the FCC is to promote effective use of the spectrum by encouraging the use of spectrum-efficient technologies (i.e. BETRS) and by assigning the minimum number of channels necessary to provide service. (a) (b) (c)
official document
· source cfr-2024
Additional charges in deportation or removal hearings.
CFR · 2024-01-01
· US
· Title 8
At any time during deportation or removal proceedings, additional or substituted charges of deportability and/or factual allegations may be lodged by the Service in writing. The alien shall be served with a copy of these additional charges and/or allegations and the Immigration Judge shall read them to the alien. The Immigration Judge shall advise the alien, if he or she is not represented by counsel, that the alien may be so represented. The alien
official document
· source cfr-2024
Additional charges.
CFR · 2024-01-01
· US
· Title 49
When a carrier— (a) Has collected the amount of tariff charges represented in a freight bill presented by it as the total amount of such charges, and (b) Thereafter presents to the shipper another freight bill for additional charges—
official document
· source cfr-2024
Additional claims judge advocate and claims attorney responsibilities (for UCMJ claims).
CFR · 2024-01-01
· US
· Title 32
In addition to the duties set forth in this subpart, the CJA or claims attorney is responsible for forwarding copies of completed Article 139 actions to USARCS, maintaining a log, monitoring the time requirements of pending Article 139 actions, and publicizing the Article 139 program to commanders, soldiers, and the community.
official document
· source cfr-2024
Additional claims; effect of prior denial of benefits.
CFR · 2024-01-01
· US
· Title 20
(a) If a claimant files a claim under this part while another claim filed by the claimant under this part is still pending, the later claim must be merged with the earlier claim for all purposes. For purposes of this section, a claim must be considered pending if it has not yet been finally denied. (b) If a claimant files a claim under this part within one year after the effective date of a final order denying a claim previously filed by the claimant under this part (see § 725.502(a)(2)), the later claim must be considered a request for modification of the prior denial and will be processed and adjudicated under § 725.310. (c) If a claimant files a claim under this part more than one year after the effective date of a final order denying a claim previously filed by the claimant under this part (see § 725.502(a)(2)), the later claim must be considered a subsequent claim for benefits. A subsequent claim will be processed and adjudicated in accordance with the provisions of subparts E and F of this part. Except as provided in paragraph (1) below, a subsequent claim must be denied unless the claimant demonstrates that one of the applicable conditions of entitlement (see §§ 725.202(d) (miner), 725.212 (spouse), 725.218 (child), and 725.222 (parent, brother, or sister)) has changed since the date upon which the order denying the prior claim became final. The applicability of this paragraph may be waived by the operator or fund, as appropriate. The following additional rules apply t
official document
· source cfr-2024
Additional classes of service employees.
CFR · 2024-01-01
· US
· Title 48
(a) If the contracting officer is aware that contract performance involves classes of service employees not included in the wage determination, the contracting officer shall require the contractor to classify the unlisted classes so as to provide a reasonable relationship (i.e., appropriate level of skill comparison) between the unlisted classifications and the classifications listed in the determination (see paragraph (c) of the clause at 52.222-41, Service Contract Labor Standards). The contractor shall initiate the conforming procedure before unlisted classes of employees perform contract work. The contractor shall submit Standard Form (SF) 1444, Request For Authorization of Additional Classification and Rate. The contracting officer shall review the proposed classification and rate and promptly submit the completed SF 1444 (which must include information regarding the agreement or disagreement of the employees' representative or the employees themselves together with the agency recommendation) and all other pertinent information to the Wage and Hour Division. Within 30 days of receipt of the request, the Wage and Hour Division will (1) approve, modify, or disapprove the request when the parties are in agreement or (2) render a final determination in the event of disagreement among the parties. If the Wage and Hour Division will require more than 30 days to take action, it will notify the contracting officer within 30 days of receipt of the request that additional time is
official document
· source cfr-2024
Additional classification factors.
CFR · 2024-01-01
· US
· Title 14
In determining the appropriate classification category, the following additional factors should be considered: (a) (b)
official document
· source cfr-2024
Additional classifications.
CFR · 2024-01-01
· US
· Title 48
(a) If any laborer or mechanic is to be employed in a classification that is not listed in the wage determination applicable to the contract, the contracting officer, pursuant to the clause at 52.222-6, Construction Wage Rate Requirements, shall require that the contractor submit to the contracting officer, Standard Form (SF) 1444, Request for Authorization of Additional Classification and Rate, which, along with other pertinent data, contains the proposed additional classification and minimum wage rate including any fringe benefits payments. (b) Upon receipt of SF 1444 from the contractor, the contracting officer shall review the request to determine whether it meets the following criteria: (1) The classification is appropriate and the work to be performed by the classification is not performed by any classification contained in the applicable wage determination. (2) The classification is utilized in the area by the construction industry. (3) The proposed wage rate, including any fringe benefits, bears a reasonable relationship to the wage rates in the wage determination in the contract. (c)(1) If the criteria in paragraph (b) of this section are met and the contractor and the laborers or mechanics to be employed in the additional classification (if known) or their representatives agree to the proposed additional (2) If the contractor, the laborers or mechanics to be employed in the classification or their representatives, and the contracting officer do not agree on the prop
official document
· source cfr-2024
Additional clauses required only in manufacturing license agreements.
CFR · 2024-01-01
· US
· Title 22
(a) (1) “No export, sale, transfer, or other disposition of the licensed article is authorized to any country outside the territory wherein manufacture or sale is herein licensed without the prior written approval of the U.S. Government unless otherwise exempted by the U.S. Government. Sales or other transfers of the licensed article shall be limited to governments of countries wherein manufacture or sale is hereby licensed and to private entities seeking to procure the licensed article pursuant to a contract with any such government unless the prior written approval of the U.S. Government is obtained.” (2) “It is agreed that sales by licensee or its sub-licensees under contracts made through the U.S. Government will not include either charges for patent rights in which the U.S. Government holds a royalty-free license, or charges for data which the U.S. Government has a right to use and disclose to others, which are in the public domain, or which the U.S. Government has acquired or is entitled to acquire without restrictions upon their use and disclosure to others.” (3) “If the U.S. Government is obligated or becomes obligated to pay to the licensor royalties, fees, or other charges for the use of technical data or patents which are involved in the manufacture, use, or sale of any licensed article, any royalties, fees or other charges in connection with purchases of such licensed article from licensee or its sub-licensees with funds derived through the U.S. Government may not
official document
· source cfr-2024
Additional clauses.
CFR · 2024-01-01
· US
· Title 48
(a) Use the basic or the alternate of the clause at 252.217-7000, Exercise of Option to Fulfill Foreign Military Sales Commitments, in solicitations and contracts when an option may be used for foreign military sales requirements. Do not use the basic or the alternate of this clause in contracts for establishment or replenishment of DoD inventories or stocks, or acquisitions made under DoD cooperative logistics support arrangements. (1) Use the basic clause when the foreign military sales country is known at the time of solicitation or award. (2) Use the alternate I clause when the foreign military sale country is not known at the time of solicitation or award. (b) When a surge option is needed in support of industrial capability production planning, use the clause at 252.217-7001, Surge Option, in solicitations and contracts. (1) Insert the percentage or quantity of increase the option represents in paragraph (a) of the clause to ensure adequate quantities are available to meet item requirements. (2) Change 30 days in paragraphs (b)(2) and (d)(1) to longer periods, if appropriate. (3) Change the 24-month period in paragraph (c)(3), if appropriate.
official document
· source cfr-2024
Additional clauses.
CFR · 2024-01-01
· US
· Title 48
(a) Use the clause at 252.228-7000, Reimbursement for War-Hazard Losses, when— (1) The clause at FAR 52.228-4, Worker's Compensation and War-Hazard Insurance Overseas, is used; and (2) The head of the contracting activity decides not to allow the contractor to buy insurance for war-hazard losses. (b) Use the clause at 252.228-7001, Ground and Flight Risk, in solicitations and contracts— (1) For the acquisition, development, production, modification, maintenance, repair, flight, or overhaul of aircraft owned by or to be delivered to the Government, except those solicitations and contracts— (i) That are strictly for activities incidental to the normal operations of the aircraft ( (ii) That are awarded for purchase under FAR part 12 procedures; (iii) For which a non-DoD customer (including an FMS customer per 225.7305) has decided to allow the use of commercial insurance or other self-insurance; (iv) For commercial derivative aircraft with an FAA certificate of airworthiness maintained to FAA standards. Performance under the exception in this paragraph (b)(1)(iv) must be at a licensed and certified FAA repair station rated for the type of aircraft and work to be maintained. This exception does not apply to contracts requiring flights with contractor crewmembers; (v) Under which the aircraft are to be dismantled and removed from the inventory; or (vi) Under which the aircraft are classified as Group 1 or 2 unmanned aircraft systems per DoD Instruction (DoDI) 6055.07, Mishap Notif
official document
· source cfr-2024
Additional clauses.
CFR · 2024-01-01
· US
· Title 48
(a) Use the clause at 252.232-7000, Advance Payment Pool, in any contract that will be subject to the terms of an advance payment pool agreement with a nonprofit organization or educational institution. Normally, use the clause in all cost reimbursement type contracts with the organization or institution. (b) Use the clause at 252.232-7005, Reimbursement of Subcontractor Advance Payments-DoD Mentor-Protégé Program, when advance payments will be provided by the contractor to a subcontractor pursuant to an approved mentor-protégé agreement (see subpart 219.71).
official document
· source cfr-2024
Additional clauses.
CFR · 2024-01-01
· US
· Title 48
(a) Use the clause at 252.232-7002, Progress Payments for Foreign Military Sales Acquisitions, in solicitations and contracts that— (i) Contain FMS requirements; and (ii) Provide for progress payments. (b) Use the clause at 252.232-7004, DoD Progress Payment Rates, instead of Alternate I of the clause at FAR 52.232-16, if the contractor is a small business concern. (c) Use the clause at 252.232-7018, Progress Payments—Multiple Lots, to authorize separate progress payment requests for multiple lots.
official document
· source cfr-2024
Additional clauses.
CFR · 2024-01-01
· US
· Title 48
(a) If the Government must execute a superseding contract and capital credits, connection charge credits, or termination liability exist, use the clause at 252.241-7000, Superseding Contract. (b) Use the clause at 252.241-70001, Government Access, when the clause at FAR 52.241-5, Contractor's Facilities, is used.
official document
· source cfr-2024
Additional clauses—contracts except running royalty contracts.
CFR · 2024-01-01
· US
· Title 48
The following clauses are examples for use in patent release and settlement agreements, and license agreements not providing for payment by the Government of a running royalty. (a) License Grant. Insert the clause at 252.227-7004. (b) License Term. Insert one of the clauses at 252.227-7005 Alternate I or Alternate II, as appropriate.
official document
· source cfr-2024
Additional clauses—contracts providing for payment of a running royalty.
CFR · 2024-01-01
· US
· Title 48
The clauses set forth below are examples which may be used in patent release and settlement agreements, and license agreements, when it is desired (a) (b) (c) (d) (2) Where more than one Department or Government Agency is licensed and there is a ceiling on the royalties payable in any reporting period, the licensing Departments or Agencies shall coordinate with respect to the pro rata share of royalties to be paid by each. (e)
official document
· source cfr-2024
Additional communication devices.
CFR · 2024-01-01
· US
· Title 33
(a) (b)
official document
· source cfr-2024
Additional competitive application requirements and procedures.
CFR · 2024-01-01
· US
· Title 28
(a) (b) (2) A joint application made by two or more applicants for assistance may have separate budgets corresponding to the programs, services and activities performed by each of the joint applicants or may have a combined budget. If joint applications present separate budgets, the Administrator may make separate awards, or may award a single assistance award authorizing separate amounts for each of the joint applicants. (c) (d) (e) (f) (1) Approve the application for funding, in whole or in part, for such amount of funds, and subject to such conditions as the Administrator deems necessary or desirable for the completion of the approved project; (2) Determine that the application is of acceptable quality for funding, in that it meets minimum criteria, but that the application must be disapproved for funding because it did not rank sufficiently high in relation to other applications approved for funding to qualify for an award based on the level of funding allocated to the program; or (3) Reject the application for failure to meet the applicable selection criteria at a sufficiently high level to justify an award of funds, or for other reason which the Administrator deems compelling, as provided in the documentation of the funding decision. (g) (h)
official document
· source cfr-2024
Additional condition for Federal financial participation (FFP).
CFR · 2024-01-01
· US
· Title 42
(a) FFP is not available in expenditures for any sterilization or hysterectomy unless the Medicaid agency, before making payment, obtained documentation showing that the requirements of this subpart were met. This documentation must include a consent from, an acknowledgement of receipt of hysterectomy information or a physician's certification under § 441.255(d)(2), as applicable. (b) With regard to the requirements of § 441.255(d) for hysterectomies performed from March 8, 1979 through November 2, 1982, FFP is available in expenditures for those services if the documentation showing that the requirements of that paragraph were met is obtained by the Medicaid agency before
official document
· source cfr-2024
Additional conditions applicable to specified categories of NPDES permits (applicable to State NPDES programs, see § 123.25).
CFR · 2024-01-01
· US
· Title 40
The following conditions, in addition to those set forth in § 122.41, apply to all NPDES permits within the categories specified below: (a) (1) That any activity has occurred or will occur which would result in the discharge, on a routine or frequent basis, of any toxic pollutant which is not limited in the permit, if that discharge will exceed the highest of the following “notification levels”: (i) One hundred micrograms per liter (100 µg/l); (ii) Two hundred micrograms per liter (200 µg/l) for acrolein and acrylonitrile; five hundred micrograms per liter (500 µg/l) for 2,4-dinitrophenol and for 2-methyl-4,6-dinitrophenol; and one milligram per liter (1 mg/l) for antimony; (iii) Five (5) times the maximum concentration value reported for that pollutant in the permit application in accordance with § 122.21(g)(7); or (iv) The level established by the Director in accordance with § 122.44(f). (2) That any activity has occurred or will occur which would result in any discharge, on a non-routine or infrequent basis, of a toxic pollutant which is not limited in the permit, if that discharge will exceed the highest of the following “notification levels”: (i) Five hundred micrograms per liter (500 µg/l); (ii) One milligram per liter (1 mg/l) for antimony; (iii) Ten (10) times the maximum concentration value reported for that pollutant in the permit application in accordance with § 122.21(g)(7). (iv) The level established by the Director in accordance with § 122.44(f). (b) (1) Any new
official document
· source cfr-2024
Additional conditions for issuance of certificates and limited permits for regulated articles moved interstate from areas quarantined for Asian citrus psyllid, but not for citrus greening.
CFR · 2024-01-01
· US
· Title 7
(a) (1) The article is treated with methyl bromide (2) The article is shipped in a container that has been sealed with an agricultural seal placed by an inspector. (3) The container that will be moved interstate is clearly labeled with the certificate. (4) A copy of the certificate will be attached to the consignee's copy of the accompanying waybill. (b) (1) The nursery in which the nursery stock is produced has entered into a compliance agreement with APHIS in which it agrees to meet the relevant construction standards, sourcing and certification requirements, cleaning, disinfecting, and safeguarding requirements, labeling requirements, and recordkeeping and inspection requirements specified in a PPQ protocol document. The protocol document will be provided to the person at the time he or she enters into the compliance agreement. (2) An inspector determines that the nursery has adhered to all terms and conditions of the compliance agreement. (3) The nursery stock is completely enclosed in a sealed container that is clearly labeled with the certificate and is moved interstate in that container. (4) A copy of the certificate is attached to the consignee's copy of the accompanying waybill. (c) (i) The nursery in which the nursery stock is produced has entered into a compliance agreement with APHIS in accordance with § 301.76-8; (ii) All citrus nursery stock at the nursery has been inspected by an inspector every 30 days, and any findings of Asian citrus psyllid during an inspec
official document
· source cfr-2024
Additional conditions for issuance of certificates and limited permits for regulated articles moved interstate from areas quarantined for citrus greening.
CFR · 2024-01-01
· US
· Title 7
(a) (1) The nursery in which the nursery stock is produced has entered into a compliance agreement with APHIS in which it agrees to meet the relevant construction standards, sourcing and (2) An inspector has determined that the nursery has adhered to all terms and conditions of the compliance agreement. (3) The nursery stock is completely enclosed in a sealed container that is clearly labeled with the certificate and is moved interstate in that container. (4) A copy of the certificate is attached to the consignee's copy of the accompanying waybill. (b) (1) The nursery stock is treated for Asian citrus psyllid with an APHIS-approved soil drench or in-ground granular application, followed by an APHIS-approved foliar spray, in accordance with § 301.76-6(b)(1), or with methyl bromide, in accordance with 305 of this chapter. (2) The nursery stock is inspected by an inspector in accordance with § 301.76-9 and found free of Asian citrus psyllid, if treated in accordance with § 301.76-6(b)(1). (3) The nursery stock is affixed prior to movement with a plastic or metal tag on which the statement “Limited permit: USDA-APHIS-PPQ. For immediate export only” is prominently and legibly displayed. If the nursery stock is destined for movement or sale in a box or container, the statement may be printed on the box or container, or printed on a label permanently affixed to the box or container, provided that, in either case, the statement is prominently and legibly displayed. (4) The nursery st
official document
· source cfr-2024
Additional conditions for trading for security futures products.
CFR · 2024-01-01
· US
· Title 17
(a) (b) (2) (i) Trading of a security futures product based on a single security shall be halted at all times that a regulatory halt has been instituted for the underlying security; and (ii) Trading of a security futures product based on a narrow-based security index shall be halted at all times that a regulatory halt has been instituted for one or more underlying securities that constitute 50 percent or more of the market capitalization of the narrow-based security index. (3) (i) (A) For a security futures product on a single equity security where the estimated deliverable supply of the underlying security exceeds 20 million shares, a designated contract market may adopt, if appropriate in light of the liquidity of trading in the underlying security, a position limit no greater than the equivalent of 12.5 percent of the estimated deliverable supply of the underlying security, either net or on the same side of the market, applicable to positions held during the last three trading days of an expiring contract month; or (B) For a security futures product on a single equity security where the six-month total trading volume in the underlying security exceeds 2.5 billion shares and there are more than 40 million shares of estimated deliverable supply, a designated contract market may adopt a position accountability rule in lieu of a position limit, either net or on the same side of the market, applicable to positions held during the last three trading days of an expiring contract
official document
· source cfr-2024
Additional conditions on certain joint research or technology licensing.
CFR · 2024-01-01
· US
· Title 15
(a) In addition to the conditions of the Technology Clawback (§ 231.203), the Secretary will specify, in the required agreement with the covered entity, any additional measures that covered entities must take to mitigate the risk of circumvention of the Technology Clawback, including measures that will allow the Secretary to recover up to the full amount of the Federal financial assistance provided to (b) For purposes of this rule, a related entity is any entity that directly, or indirectly through one or more intermediaries, controls or is controlled by, or is under common control with, the covered entity.
official document
· source cfr-2024
Additional conditions.
CFR · 2024-01-01
· US
· Title 42
The Secretary may with respect to any grant award or class of awards impose additional conditions prior to or at the time of any award when in the Secretary's judgment such conditions are necessary to assure or protect advancement of the approved project, the interests of the public health, or the conservation of grant funds.
official document
· source cfr-2024
Additional conditions.
CFR · 2024-01-01
· US
· Title 42
The Director may, with respect to any grant award, impose additional conditions prior to or at the time of any award when in the Director's judgment the conditions are necessary to assure the carrying out of the purposes of the award, the interests of the public
official document
· source cfr-2024
Additional conditions.
CFR · 2024-01-01
· US
· Title 42
The Director may with respect to any grant award impose additional conditions consistent with the regulations of this part prior to or at the time of any award when in the Director's judgment the conditions are necessary to assure or protect advancement of the approved project, the purposes of the applicable provisions of the Act, or the conservation of grant funds.
official document
· source cfr-2024
Additional conditions.
CFR · 2024-01-01
· US
· Title 42
The Secretary may with respect to any grant award impose additional conditions prior to or at the time of any award when in the Secretary's judgment those conditions are necessary to assure or protect advancement of the approved program, the interests of the public health, or the conservation of grant funds.
official document
· source cfr-2024
Additional conditions.
CFR · 2024-01-01
· US
· Title 42
The Director, NCI, may with respect to any grant award impose additional conditions prior to or at the time of any award when in the NCI Director's judgment those conditions are necessary to assure or protect advancement of the approved program, the interests of the public health, or the conservation of grant funds.
official document
· source cfr-2024
Additional conditions.
CFR · 2024-01-01
· US
· Title 42
The Director, may with respect to any grant award impose additional conditions prior to or at the time of any award when in the Director's judgment those conditions are necessary to assure or protect advancement of the approved project, the interests of the public health, or the conservation of grant funds.
official document
· source cfr-2024
Additional conditions.
CFR · 2024-01-01
· US
· Title 42
The Director may, with respect to any grant award, impose additional conditions prior to, or at the time of, any award when in the Director's judgment the conditions are necessary to ensure the carrying out of the purposes of the award, the interests of the public health, or the conservation of grant funds.
official document
· source cfr-2024
Additional conditions.
CFR · 2024-01-01
· US
· Title 42
The Secretary may with respect to any agreement entered into with any school under § 57.205, impose additional conditions prior to or at the time of any award when in his or her judgment these conditions are necessary to assure or protect the advancement of the purposes of the agreement, the interest of the public health, or the conservation of funds awarded.
official document
· source cfr-2024
Additional conditions.
CFR · 2024-01-01
· US
· Title 42
The Secretary may, with respect to any agreement entered into with any school under § 57.305, impose additional conditions prior to or at the time of any award when in his or her judgment the conditions are necessary to assure or protect advancement of the purposes of the agreement, the interest of the public health, or the conservation of funds awarded.
official document
· source cfr-2024
Additional conditions.
CFR · 2024-01-01
· US
· Title 42
The Secretary may, with respect to any grant, impose additional conditions prior to, at the time of, or during
official document
· source cfr-2024
Additional conditions.
CFR · 2024-01-01
· US
· Title 42
The Secretary may with respect to any grant award impose additional conditions prior to or at the time of any award when in his judgment such conditions are necessary to assure or protect advancement of the approved project, the interests of public health, or the conservation of grant funds.
official document
· source cfr-2024
Additional conditions.
CFR · 2024-01-01
· US
· Title 42
The Director may with respect to any award impose additional conditions prior to, or at the time of, any award when, in the Director's judgment, such conditions are necessary to assure the carrying out of the purposes of the award, the interest of the public health, or the conservation of funds awarded.
official document
· source cfr-2024
Additional conditions.
CFR · 2024-01-01
· US
· Title 42
The Secretary may with respect to any Award or class of Awards impose additional conditions prior to or at the time of any Award when in the Secretary's judgment such conditions are necessary to assure the carrying out of the purposes of the Award, the interests of the public health, or the conservation of funds awarded.
official document
· source cfr-2024
Additional conditions.
CFR · 2024-01-01
· US
· Title 42
The Secretary may, with respect to any grant award, impose additional conditions prior to or at the time of any award when in the Secretary's judgment those conditions are necessary to assure or protect advancement of the approved program, the interests of the public health, or the conservation of grant funds.
official document
· source cfr-2024
Additional conditions.
CFR · 2024-01-01
· US
· Title 42
The Administrator may, with respect to any grant awarded under this subpart, impose additional conditions prior to or at the time of any award when in the Administrator's judgment such conditions are necessary to assure or protect advancement of the approved project, the interest of the public health, or the conservation of grant funds.
official document
· source cfr-2024
Additional conditions.
CFR · 2024-01-01
· US
· Title 42
(a) When a shortage of funds exists, participants may be funded only partially, as determined by the NIH. However, once an NIH LRP contract has been signed by both parties, the NIH will obligate such funds as necessary to (b) Additional conditions may be imposed as deemed necessary.
official document
· source cfr-2024
Additional conditions.
CFR · 2024-01-01
· US
· Title 42
The Secretary may with respect to any grant award impose additional conditions prior to or at the time of any award when in his judgment such conditions are necessary to assure or protect advancement of the approved project, the interests of public health, or the conservation of grant funds.
official document
· source cfr-2024
Additional conditions.
CFR · 2024-01-01
· US
· Title 42
The Secretary may impose additional conditions prior to or at the time of any grant award when in the Secretary's judgment such conditions are necessary to assure or protect advancement of the project in accordance with the purposes of the Act and the regulations of this subpart or the conservation of grant funds.
official document
· source cfr-2024
Additional conditions.
CFR · 2024-01-01
· US
· Title 42
The Secretary may with respect to any grant award impose additional conditions prior to or at the time of any award when in his judgment such conditions are necessary to assure or protect advancement of the approved project, the interests of public health, or the conservation of grant funds.
official document
· source cfr-2024
Additional conditions.
CFR · 2024-01-01
· US
· Title 42
The Secretary may, with respect to any grant award under this subpart, impose additional conditions prior to or at the time of any award when in his judgment such conditions are necessary to assure or protect advancement of the approved project, the interests of the public health, or the conservation of grant funds.
official document
· source cfr-2024
Additional considerations for field-initiated priorities.
CFR · 2024-01-01
· US
· Title 45
(a) The Director reserves funds to support field-initiated applications funded under this part when those applications have been awarded points totaling 85 percent or more of the maximum possible points under the procedures described in § 1330.23. (b) In making a final selection from applications received when NIDILRR uses field-initiated priorities, the Director may consider whether one of the following conditions is met and, if so, use this information to fund an application out of rank order: (1) The proposed project represents a unique opportunity to advance rehabilitation and other knowledge to improve the lives of individual with disabilities. (2) The proposed project complements or balances research activity already planned or funded by NIDILRR through its annual priorities or addresses the research in a new and promising way. (c) If the Director funds an application out of rank order under paragraph (b) of this section, the public will be notified through a notice on the NIDILRR Web site or through other means deemed appropriate by the Director.
official document
· source cfr-2024
Additional considerations.
CFR · 2024-01-01
· US
· Title 10
(a) The Commission will not conduct more than one review of site suitability issues with regard to a particular site prior to filing and review of part two of the application described in § 2.101(a-1) of this part. (b) The Commission, upon its own initiative, or upon the motion of any party to the proceeding filed at least 60 days prior to the date of the commencement of the evidentiary hearing on site suitability issues, may decline to initiate an early hearing or render an early partial decision on any issue or issues of site suitability: (1) In cases where no partial decision on the relative merits of the proposed site and alternative sites under subpart A of part 51 of this chapter is requested, upon determination that there is a reasonable likelihood that further review would identify one or more preferable alternative sites and the partial decision on one or more site suitability issues would lead to an irreversible and irretrievable commitment of resources prior to the submittal of the remainder of the information required by § 50.30(f) of this chapter that would prejudice the later review and decision on such alternative sites; or (2) In cases where it appears that an early partial decision on any issue or issues of site suitability would not be in the public interest considering: (i) The degree of likelihood that any early findings on those issues would retain their validity in later reviews; (ii) The objections, if any, of cognizant State or local government agencie
official document
· source cfr-2024
Additional considerations.
CFR · 2024-01-01
· US
· Title 10
(a) The Commission will not conduct more than one review of site suitability issues with regard to a particular site prior to filing and review of part two of the application described in § 2.101(a-1) of this part. (b) The Commission, upon its own initiative, or upon the motion of any party to the proceeding filed at least 60 days prior to the date of the commencement of the evidentiary hearing on site suitability issues, may decline to initiate an early hearing or render an early partial decision on any issue or issues of site suitability: (1) In cases where no partial decision on the relative merits of the proposed site and alternative sites under subpart A of part 51 is requested, upon determination that there is a reasonable likelihood that further review would identify one or more preferable alternative sites and the partial decision on one or more site suitability issues would lead to an irreversible and irretrievable commitment of resources prior to the submittal of the remainder of the information required by § 50.30(f) of this chapter that would prejudice the later review and decision on such alternative sites; or (2) In cases where it appears that an early partial decision on any issue or issues of site suitability would not be in the public interest considering: (i) The degree of likelihood that any early findings on those issues would retain their validity in later reviews; (ii) The objections, if any, of cognizant State or local government agencies to the conduct
official document
· source cfr-2024
Additional considerations.
CFR · 2024-01-01
· US
· Title 15
(a) Upon settlement of a claim, trustees should consider the following actions to facilitate implementation of restoration: (1) Establish a trustee committee and/or memorandum of understanding or other agreement to coordinate among affected trustees, as provided in § 990.14(a)(3) of this part; (2) Develop more detailed workplans to implement restoration; (3) Monitor and oversee restoration; and (4) Evaluate restoration success and the need for corrective action. (b) The reasonable costs of such actions are included as restoration costs.
official document
· source cfr-2024
Additional considerations.
CFR · 2024-01-01
· US
· Title 48
(a) While it is not feasible to set forth standard language which would apply to every contract situation, language must be designed for inclusion in a management and operating contract to describe clearly the work being undertaken; the controls, as appropriate, to be exercised by DOE over the performance of that work; and the relationship contemplated between the parties. (b) The language shall also include the following with respect to subcontracting performance of the work described pursuant to paragraph (a) of this section: “The contractor shall, when directed by DOE and may, but only when authorized by DOE, enter into subcontracts for the performance of any part of the work under this clause.” (c) The provisions required in paragraphs (a) and (b) of this section shall be set forth in the statement of work of the contract.
official document
· source cfr-2024
Additional construction requirements for steel pipe using alternative maximum allowable operating pressure.
CFR · 2024-01-01
· US
· Title 49
For a new or existing pipeline segment to be eligible for operation at the alternative maximum allowable operating pressure calculated under § 192.620, a segment must meet the following additional construction requirements. Records must be maintained, for the useful life of the pipeline, demonstrating compliance with these requirements:
official document
· source cfr-2024
Additional content of applications.
CFR · 2024-01-01
· US
· Title 10
(a) In addition to the contents required by § 70.22, each application must include a description of the applicant's safety program established under § 70.62. (b) The integrated safety analysis summary must be submitted with the license or renewal application (and amendment application as necessary), but shall not be incorporated in the license. However, changes to the integrated safety analysis summary shall meet the conditions of § 70.72. The integrated safety analysis summary must contain: (1) A general description of the site with emphasis on those factors that could affect safety ( (2) A general description of the facility with emphasis on those areas that (3) A description of each process (defined as a single reasonably simple integrated unit operation within an overall production line) analyzed in the integrated safety analysis in sufficient detail to understand the theory of operation; and, for each process, the hazards that were identified in the integrated safety analysis pursuant to § 70.62(c)(1)(i)-(iii) and a general description of the types of accident sequences; (4) Information that demonstrates the licensee's compliance with the performance requirements of § 70.61, including a description of the management measures; the requirements for criticality monitoring and alarms in § 70.24; and, if applicable, the requirements of § 70.64; (5) A description of the team, qualifications, and the methods used to perform the integrated safety analysis; (6) A list briefly des
official document
· source cfr-2024
Additional contents of applications to discontinue, reduce, or impair an existing retail service as part of a technology transition.
CFR · 2024-01-01
· US
· Title 47
(a) The application shall include: (1) The contents specified in § 63.505 of this part; (2) A statement identifying the application as involving a technology transition, as defined in § 63.60(i); (3) Information regarding the price of the service for which discontinuance authority is sought and the price of the proposed replacement service; and (4) A certification, executed by an officer or other authorized representative of the applicant and meeting the requirements of § 1.16 of this chapter, that the information required by this section is true and accurate. (b) In order to be eligible for automatic grant under § 63.71(f) of this part, an applicant must demonstrate that a service(s) identified pursuant to § 63.505(k)(2) of this part is an adequate replacement for the voice service identified pursuant to § 63.505(k)(1) of this part by either certifying or showing, based on the totality of the circumstances, that one or more replacement service(s) satisfies all of the following criteria: (1) Offers substantially similar levels of network infrastructure and service quality as the service being discontinued; (2)(i) Complies with regulations regarding the availability and functionality of 911 service for consumers and public safety answering points (PSAPs), specifically §§ 1.7001 through .7002, 9.5, 12.4, 12.5, 20.18, 20.3, 64.3001 of this chapter; (ii) Offers comparably effective protection from network security risks as the service being discontinued; and (iii) Complies with r
official document
· source cfr-2024